Data Center Directory

Атомдата Иннополис

Атомдата Иннополис is an operational data center in Vasil’yevo, Russia. Our footprint estimate of its power is about 10 MW.

Key facts

StatusOperational
Facility power10 MW (range 5 MW to 16 MW)
Estimate from building footprint, low confidence. Footprint estimate: about 8,293 m² building outline x 1 floor(s) x 1.2 kW/m².
GPU capacity if all AIabout 4,300 GPUs
If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count.
AddressЦентральная улица 304
Opened2024
Coordinates55.75928, 48.75482

Power and grid

Grid carbon intensity447 g CO₂ per kWh (Russia, 2025)
Average of all power made in the area. Ember.
Grid power mixgas 45.6%, nuclear 18.3%, coal 17.7%, hydro 16.7%, oil and other fossil 1%. Clean power: 35.7%

Climate and water

Water stress todayLow - Medium (10-20%) (Russia)
Share of the local water supply that people already use. WRI Aqueduct 4.0, country level.
Water stress in 2050Low - Medium (10-20%)
Business-as-usual scenario.

Satellite view

Questions

How much power does Атомдата Иннополис use?

We estimate the facility power at about 10 MW. Estimate from building footprint, low confidence.

How clean is the power for Атомдата Иннополис?

The grid in Russia emits about 447 g CO₂ per kWh (2025). Largest sources: gas 45.6%, nuclear 18.3%, coal 17.7%.

Data centers near Vasil’yevo

Sources

Correct this page or get the data

Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.