Атомдата Иннополис
Атомдата Иннополис is an operational data center in Vasil’yevo, Russia. Our footprint estimate of its power is about 10 MW.
Key facts
| Status | Operational |
|---|---|
| Facility power | 10 MW (range 5 MW to 16 MW) Estimate from building footprint, low confidence. Footprint estimate: about 8,293 m² building outline x 1 floor(s) x 1.2 kW/m². |
| GPU capacity if all AI | about 4,300 GPUs If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count. |
| Address | Центральная улица 304 |
| Opened | 2024 |
| Coordinates | 55.75928, 48.75482 |
Power and grid
| Grid carbon intensity | 447 g CO₂ per kWh (Russia, 2025) Average of all power made in the area. Ember. |
|---|---|
| Grid power mix | gas 45.6%, nuclear 18.3%, coal 17.7%, hydro 16.7%, oil and other fossil 1%. Clean power: 35.7% |
Climate and water
| Water stress today | Low - Medium (10-20%) (Russia) Share of the local water supply that people already use. WRI Aqueduct 4.0, country level. |
|---|---|
| Water stress in 2050 | Low - Medium (10-20%) Business-as-usual scenario. |
Satellite view
Google satellite · Copernicus Sentinel-2 history · OpenStreetMap
Questions
How much power does Атомдата Иннополис use?
We estimate the facility power at about 10 MW. Estimate from building footprint, low confidence.
How clean is the power for Атомдата Иннополис?
The grid in Russia emits about 447 g CO₂ per kWh (2025). Largest sources: gas 45.6%, nuclear 18.3%, coal 17.7%.