VIRTUS LONDON2 (Hayes)
VIRTUS LONDON2 (Hayes) is an operational data center operated by VIRTUS Data Centres in Hayes, United Kingdom. No power figure is public for this site yet.
Key facts
| Status | Operational |
|---|---|
| Operator | VIRTUS Data Centres |
| Networks | 6 networks, 2 internet exchanges PeeringDB. |
| Address | VIRTUS Data Centre, Western International Park, Hayes Road |
| Coordinates | 51.51579, -0.14030 |
| Website | 2.virtusdatacentres.com/LONDON-2 |
Power and grid
| Nearest high-voltage substation | Duke Street Substation, 132 kV, 800 m away (UK Power Networks) Straight-line distance. OpenStreetMap, substations of 100 kV and more. |
|---|---|
| Nearest 220 kV+ substation | St John's Wood substation, 400 kV, 2.5 km away |
| HV substations within 10 km | 66 |
| Power plants within 50 km | 2.9 GW in 92 plants
Plants with a stated output in OpenStreetMap. The largest four are listed. |
| Grid carbon intensity | 218 g CO₂ per kWh (United Kingdom, 2025) Average of all power made in the area. Ember. |
| Grid power mix | gas 31.3%, wind 29.4%, bioenergy 13.9%, nuclear 12.4%, solar 6.6%. Clean power: 64.2% |
Climate and water
| Average temperature | 10.4 °C NASA POWER, average of 2001 to 2025. |
|---|---|
| Highest temperature | 34 °C (2001 to 2025) |
| Cooling degree days | 46 per year (base 18.3 °C) More cooling degree days means more energy for cooling. |
| Solar energy | 2.97 kWh per m² per day |
| Wind at 50 m | 7.2 m/s average |
| Water stress today | Low - Medium (10-20%) (England) Share of the local water supply that people already use. WRI Aqueduct 4.0, province level. |
| Water stress in 2050 | Low - Medium (10-20%) Business-as-usual scenario. |
Satellite view
Google satellite · Copernicus Sentinel-2 history · OpenStreetMap
Questions
How close is VIRTUS LONDON2 (Hayes) to the power grid?
The nearest high-voltage substation in OpenStreetMap is Duke Street Substation (132 kV), about 800 m away.
How clean is the power for VIRTUS LONDON2 (Hayes)?
The grid in United Kingdom emits about 218 g CO₂ per kWh (2025). Largest sources: gas 31.3%, wind 29.4%, bioenergy 13.9%.
Who operates VIRTUS LONDON2 (Hayes)?
VIRTUS Data Centres.
Data centers near Hayes
- DataGrid Network London 701 m
- Tarisu Limited 1.2 km
- Digital Realty London LHR13 2.0 km
- Verizon UK5 2.5 km · 11 MW
- Visa London 2.8 km · 21 MW
- Volta 2.8 km · 2.2 MW
- Level(3) London (Goswell Road) 3.1 km
- Stellanor London North 3.1 km · 9.7 MW
More VIRTUS Data Centres data centers
- VIRTUS LONDON4 (Slough) United Kingdom
Sources
Correct this page or get the data
Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.