VIVE DIGITAL
VIVE DIGITAL is an operational data center in Maní, Colombia. Our footprint estimate of its power is about 0.6 MW.
Key facts
| Status | Operational |
|---|---|
| Facility power | 0.6 MW (range 0.3 MW to 0.9 MW) Estimate from building footprint, low confidence. Footprint estimate: about 465 m² building outline x 1 floor(s) x 1.2 kW/m². |
| GPU capacity if all AI | about 260 GPUs If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count. |
| Coordinates | 4.82038, -72.28648 |
Power and grid
| Grid carbon intensity | 185 g CO₂ per kWh (Colombia, 2025) Average of all power made in the area. Ember. |
|---|---|
| Grid power mix | hydro 68.5%, gas 13%, solar 5.9%, coal 5.5%, oil and other fossil 4.3%. Clean power: 77.1% |
Climate and water
| Water stress today | Low (<10%) (Colombia) Share of the local water supply that people already use. WRI Aqueduct 4.0, country level. |
|---|---|
| Water stress in 2050 | Low (<10%) Business-as-usual scenario. |
Satellite view
Google satellite · Copernicus Sentinel-2 history · OpenStreetMap
Questions
How much power does VIVE DIGITAL use?
We estimate the facility power at about 0.6 MW. Estimate from building footprint, low confidence.
How clean is the power for VIVE DIGITAL?
The grid in Colombia emits about 185 g CO₂ per kWh (2025). Largest sources: hydro 68.5%, gas 13%, solar 5.9%.
Data centers near Maní
- Data center in Yopal 59.2 km
- Araguaney 66.2 km
Sources
Correct this page or get the data
Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.