Voltage Park Texas

Voltage Park Texas is an operational AI data center operated by Voltage Park in Brownwood, United States. Its power is about 4.9 MW. Epoch AI estimates about 1,000 H100-equivalent AI chips (NVIDIA A100, NVIDIA H100 SXM5 80GB, Intel Habana Gaudi2).

Key facts

StatusOperational
OperatorVoltage Park
Facility power4.9 MW
Reported (Epoch AI or owner data)
AI compute1,000 H100-equivalents
AI chipsNVIDIA A100, NVIDIA H100 SXM5 80GB, Intel Habana Gaudi2
Reported (Epoch AI or owner data)
Chip count4,000
Largest reported cluster at this site (Epoch AI).
GPU capacity if all AIabout 2,100 GPUs
If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count.
AddressTexas
Coordinates31.80397, -98.82232

Power and grid

Nearest high-voltage substationZephyr Substation, 138 kV, 11.1 km away (Brazos Electric)
Straight-line distance. OpenStreetMap, substations of 100 kV and more.
Nearest 220 kV+ substationCorn Trail Switching Station, 345 kV, 15.1 km away
UtilityComanche County Elec Coop Assn (cooperative)
Electric retail service territory (HIFLD, US government).
Balancing authorityERCO
Nearest gas pipelineAtmos Pipeline - Texas, intrastate pipeline, 7.3 km away
US Energy Information Administration pipeline map. Straight-line distance.
Power plants within 50 km320 MW in 1 plant
Plants with a stated output in OpenStreetMap. The largest four are listed.
Grid carbon intensity379 g CO₂ per kWh (Texas, 2025)
Average of all power made in the area. Ember.
Grid power mixgas 48.3%, wind 21.7%, coal 11.6%, solar 10.7%, nuclear 7%. Clean power: 39.8%
Industrial power priceUSD 0.072 per kWh (Texas, August 2026)
Average price paid by industrial users in the state. EIA Electric Power Monthly.

Climate and water

Average temperature18.5 °C
NASA POWER, average of 2001 to 2025.
Highest temperature44.4 °C (2001 to 2025)
Cooling degree days1,495 per year (base 18.3 °C)
More cooling degree days means more energy for cooling.
Solar energy4.98 kWh per m² per day
Wind at 50 m6.8 m/s average
Water stress todayHigh (40-80%) (Texas)
Share of the local water supply that people already use. WRI Aqueduct 4.0, province level.
Water stress in 2050High (40-80%)
Business-as-usual scenario.

GPU clusters at this site

ClusterChipsCountPowerSince
Microsoft Azure Pioneer-SCUSNVIDIA A1001,3121.1 MW2021-06-01
Voltage Park Texas Phase 1NVIDIA H100 SXM5 80GB1,0001.4 MW2024-02-27
Intel Stability Gaudi 2Intel Habana Gaudi24,0004.9 MW2024-03-11

Source: Epoch AI GPU Clusters.

Satellite view

Questions

How much power does Voltage Park Texas use?

Public data puts the facility power at about 4.9 MW. Reported (Epoch AI or owner data).

What chips does Voltage Park Texas use?

Reported chips: NVIDIA A100, NVIDIA H100 SXM5 80GB, Intel Habana Gaudi2.

How close is Voltage Park Texas to the power grid?

The nearest high-voltage substation in OpenStreetMap is Zephyr Substation (138 kV), about 11.1 km away. The local utility is Comanche County Elec Coop Assn, in the ERCO balancing area.

How clean is the power for Voltage Park Texas?

The grid in Texas emits about 379 g CO₂ per kWh (2025). Largest sources: gas 48.3%, wind 21.7%, coal 11.6%.

Who operates Voltage Park Texas?

Voltage Park.