Voltage Park Texas
Voltage Park Texas is an operational AI data center operated by Voltage Park in Brownwood, United States. Its power is about 4.9 MW. Epoch AI estimates about 1,000 H100-equivalent AI chips (NVIDIA A100, NVIDIA H100 SXM5 80GB, Intel Habana Gaudi2).
Key facts
| Status | Operational |
|---|---|
| Operator | Voltage Park |
| Facility power | 4.9 MW Reported (Epoch AI or owner data) |
| AI compute | 1,000 H100-equivalents |
| AI chips | NVIDIA A100, NVIDIA H100 SXM5 80GB, Intel Habana Gaudi2 Reported (Epoch AI or owner data) |
| Chip count | 4,000 Largest reported cluster at this site (Epoch AI). |
| GPU capacity if all AI | about 2,100 GPUs If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count. |
| Address | Texas |
| Coordinates | 31.80397, -98.82232 |
Power and grid
| Nearest high-voltage substation | Zephyr Substation, 138 kV, 11.1 km away (Brazos Electric) Straight-line distance. OpenStreetMap, substations of 100 kV and more. |
|---|---|
| Nearest 220 kV+ substation | Corn Trail Switching Station, 345 kV, 15.1 km away |
| Utility | Comanche County Elec Coop Assn (cooperative) Electric retail service territory (HIFLD, US government). |
| Balancing authority | ERCO |
| Nearest gas pipeline | Atmos Pipeline - Texas, intrastate pipeline, 7.3 km away US Energy Information Administration pipeline map. Straight-line distance. |
| Power plants within 50 km | 320 MW in 1 plant
Plants with a stated output in OpenStreetMap. The largest four are listed. |
| Grid carbon intensity | 379 g CO₂ per kWh (Texas, 2025) Average of all power made in the area. Ember. |
| Grid power mix | gas 48.3%, wind 21.7%, coal 11.6%, solar 10.7%, nuclear 7%. Clean power: 39.8% |
| Industrial power price | USD 0.072 per kWh (Texas, August 2026) Average price paid by industrial users in the state. EIA Electric Power Monthly. |
Climate and water
| Average temperature | 18.5 °C NASA POWER, average of 2001 to 2025. |
|---|---|
| Highest temperature | 44.4 °C (2001 to 2025) |
| Cooling degree days | 1,495 per year (base 18.3 °C) More cooling degree days means more energy for cooling. |
| Solar energy | 4.98 kWh per m² per day |
| Wind at 50 m | 6.8 m/s average |
| Water stress today | High (40-80%) (Texas) Share of the local water supply that people already use. WRI Aqueduct 4.0, province level. |
| Water stress in 2050 | High (40-80%) Business-as-usual scenario. |
GPU clusters at this site
| Cluster | Chips | Count | Power | Since |
|---|---|---|---|---|
| Microsoft Azure Pioneer-SCUS | NVIDIA A100 | 1,312 | 1.1 MW | 2021-06-01 |
| Voltage Park Texas Phase 1 | NVIDIA H100 SXM5 80GB | 1,000 | 1.4 MW | 2024-02-27 |
| Intel Stability Gaudi 2 | Intel Habana Gaudi2 | 4,000 | 4.9 MW | 2024-03-11 |
Source: Epoch AI GPU Clusters.
Satellite view
Google satellite · Copernicus Sentinel-2 history · OpenStreetMap
Questions
How much power does Voltage Park Texas use?
Public data puts the facility power at about 4.9 MW. Reported (Epoch AI or owner data).
What chips does Voltage Park Texas use?
Reported chips: NVIDIA A100, NVIDIA H100 SXM5 80GB, Intel Habana Gaudi2.
How close is Voltage Park Texas to the power grid?
The nearest high-voltage substation in OpenStreetMap is Zephyr Substation (138 kV), about 11.1 km away. The local utility is Comanche County Elec Coop Assn, in the ERCO balancing area.
How clean is the power for Voltage Park Texas?
The grid in Texas emits about 379 g CO₂ per kWh (2025). Largest sources: gas 48.3%, wind 21.7%, coal 11.6%.
Who operates Voltage Park Texas?
Voltage Park.