Welcome Italia spa - Data Center
Welcome Italia spa - Data Center is an operational data center operated by Welcome Italia in Pisa, Italy. No power figure is public for this site yet.
Key facts
| Status | Operational |
|---|---|
| Operator | Welcome Italia |
| Networks | 3 networks PeeringDB. |
| Address | Via E. Giannessi 14 |
| Coordinates | 43.65667, 10.43611 |
| Website | welcomeitalia.it/it/vianova/colocation |
Power and grid
| Nearest high-voltage substation | CP Ospedaletto, 132 kV, 3.4 km away (Terna) Straight-line distance. OpenStreetMap, substations of 100 kV and more. |
|---|---|
| Nearest 220 kV+ substation | Acciaiolo, 380 kV, 12.5 km away |
| HV substations within 10 km | 10 |
| Power plants within 50 km | 383 MW in 9 plants
Plants with a stated output in OpenStreetMap. The largest four are listed. |
| Grid carbon intensity | 285 g CO₂ per kWh (Italy, 2025) Average of all power made in the area. Ember. |
| Grid power mix | gas 47.4%, solar 16.8%, hydro 15.7%, wind 8.1%, bioenergy 5.9%. Clean power: 48.7% |
| Industrial power price | EUR 0.173 per kWh (Italy, 2026-S1) Non-household users with 20 to 70 GWh per year, without VAT. Eurostat. |
Climate and water
| Average temperature | 15.6 °C NASA POWER, average of 2001 to 2025. |
|---|---|
| Highest temperature | 39.1 °C (2001 to 2025) |
| Cooling degree days | 742 per year (base 18.3 °C) More cooling degree days means more energy for cooling. |
| Solar energy | 4.18 kWh per m² per day |
| Wind at 50 m | 4.9 m/s average |
| Water stress today | High (40-80%) (Italy) Share of the local water supply that people already use. WRI Aqueduct 4.0, country level. |
| Water stress in 2050 | High (40-80%) Business-as-usual scenario. |
Satellite view
Google satellite · Copernicus Sentinel-2 history · OpenStreetMap
Questions
How close is Welcome Italia spa - Data Center to the power grid?
The nearest high-voltage substation in OpenStreetMap is CP Ospedaletto (132 kV), about 3.4 km away.
How clean is the power for Welcome Italia spa - Data Center?
The grid in Italy emits about 285 g CO₂ per kWh (2025). Largest sources: gas 47.4%, solar 16.8%, hydro 15.7%.
Who operates Welcome Italia spa - Data Center?
Welcome Italia.
Data centers near Pisa
- Green Data Center Università di Pisa - Edificio Server 6.7 km · 1.5 MW
- Sirius Technology DC - Quarrata 47.7 km
- Ampersand La Spezia 70.1 km
- Wi-Fi Communication Aulla 71.8 km
Sources
Correct this page or get the data