Wellcamp Business Park DC

Wellcamp Business Park DC is an operational data center operated by Wellcamp Business Park in Wellcamp, Australia. No power figure is public for this site yet.

Key facts

StatusOperational
OperatorWellcamp Business Park
Address1511 Toowoomba Cecil Plains Rd, Wellcamp QLD 4350
Coordinates-27.55120, 151.81605
Websitewagnercorporation.com.au/business-park/data-centre

Power and grid

Nearest high-voltage substationUnnamed substation, 110 kV, 8.3 km away
Straight-line distance. OpenStreetMap, substations of 100 kV and more.
Nearest 220 kV+ substationMiddle Ridge Substation, 330 kV, 15 km away
HV substations within 10 km1
Power plants within 50 km556 MW in 4 plants
Plants with a stated output in OpenStreetMap. The largest four are listed.
Grid carbon intensity518 g CO₂ per kWh (Australia, 2025)
Average of all power made in the area. Ember.
Grid power mixcoal 42.9%, solar 20.4%, gas 15.5%, wind 13.8%, hydro 4.4%. Clean power: 39.8%

Climate and water

Average temperature18.7 °C
NASA POWER, average of 2001 to 2025.
Highest temperature43.1 °C (2001 to 2025)
Cooling degree days998 per year (base 18.3 °C)
More cooling degree days means more energy for cooling.
Solar energy5.21 kWh per m² per day
Wind at 50 m5.5 m/s average
Water stress todayLow - Medium (10-20%) (Queensland)
Share of the local water supply that people already use. WRI Aqueduct 4.0, province level.
Water stress in 2050Low - Medium (10-20%)
Business-as-usual scenario.

Satellite view

Questions

How close is Wellcamp Business Park DC to the power grid?

The nearest high-voltage substation in OpenStreetMap is an unnamed substation (110 kV), about 8.3 km away.

How clean is the power for Wellcamp Business Park DC?

The grid in Australia emits about 518 g CO₂ per kWh (2025). Largest sources: coal 42.9%, solar 20.4%, gas 15.5%.

Who operates Wellcamp Business Park DC?

Wellcamp Business Park.