Wellcamp Business Park DC
Wellcamp Business Park DC is an operational data center operated by Wellcamp Business Park in Wellcamp, Australia. No power figure is public for this site yet.
Key facts
| Status | Operational |
|---|---|
| Operator | Wellcamp Business Park |
| Address | 1511 Toowoomba Cecil Plains Rd, Wellcamp QLD 4350 |
| Coordinates | -27.55120, 151.81605 |
| Website | wagnercorporation.com.au/business-park/data-centre |
Power and grid
| Nearest high-voltage substation | Unnamed substation, 110 kV, 8.3 km away Straight-line distance. OpenStreetMap, substations of 100 kV and more. |
|---|---|
| Nearest 220 kV+ substation | Middle Ridge Substation, 330 kV, 15 km away |
| HV substations within 10 km | 1 |
| Power plants within 50 km | 556 MW in 4 plants
Plants with a stated output in OpenStreetMap. The largest four are listed. |
| Grid carbon intensity | 518 g CO₂ per kWh (Australia, 2025) Average of all power made in the area. Ember. |
| Grid power mix | coal 42.9%, solar 20.4%, gas 15.5%, wind 13.8%, hydro 4.4%. Clean power: 39.8% |
Climate and water
| Average temperature | 18.7 °C NASA POWER, average of 2001 to 2025. |
|---|---|
| Highest temperature | 43.1 °C (2001 to 2025) |
| Cooling degree days | 998 per year (base 18.3 °C) More cooling degree days means more energy for cooling. |
| Solar energy | 5.21 kWh per m² per day |
| Wind at 50 m | 5.5 m/s average |
| Water stress today | Low - Medium (10-20%) (Queensland) Share of the local water supply that people already use. WRI Aqueduct 4.0, province level. |
| Water stress in 2050 | Low - Medium (10-20%) Business-as-usual scenario. |
Satellite view
Google satellite · Copernicus Sentinel-2 history · OpenStreetMap
Questions
How close is Wellcamp Business Park DC to the power grid?
The nearest high-voltage substation in OpenStreetMap is an unnamed substation (110 kV), about 8.3 km away.
How clean is the power for Wellcamp Business Park DC?
The grid in Australia emits about 518 g CO₂ per kWh (2025). Largest sources: coal 42.9%, solar 20.4%, gas 15.5%.
Who operates Wellcamp Business Park DC?
Wellcamp Business Park.
Data centers near Wellcamp
- Pulse Data Center 3.0 km
Sources
Correct this page or get the data
Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.