Data Center Directory

WILOHOSTING DATACENTER

WILOHOSTING DATACENTER is an operational data center operated by WILOHOSTING in Caaguazú, Paraguay. No power figure is public for this site yet.

Key facts

StatusOperational
OperatorWILOHOSTING
Networks1 networks
PeeringDB.
AddressLiceo San Rafael c/ Nanawa, Barrio San Lorenzo
Coordinates-25.46708, -56.03427
Websitewilohosting.com.py/housing

Power and grid

Nearest high-voltage substationSubestación Eléctrica de Caaguazú - ANDE, 220 kV, 4.1 km away
Straight-line distance. OpenStreetMap, substations of 100 kV and more.
HV substations within 10 km4
Grid carbon intensity25 g CO₂ per kWh (Paraguay, 2025)
Average of all power made in the area. Ember.
Grid power mixhydro 99.4%, bioenergy 0.5%. Clean power: 100%

Climate and water

Average temperature22.2 °C
NASA POWER, average of 2001 to 2025.
Highest temperature41.2 °C (2001 to 2025)
Cooling degree days1,811 per year (base 18.3 °C)
More cooling degree days means more energy for cooling.
Solar energy4.89 kWh per m² per day
Wind at 50 m3.2 m/s average
Water stress todayLow (<10%) (Paraguay)
Share of the local water supply that people already use. WRI Aqueduct 4.0, country level.
Water stress in 2050Low (<10%)
Business-as-usual scenario.

Satellite view

Questions

How close is WILOHOSTING DATACENTER to the power grid?

The nearest high-voltage substation in OpenStreetMap is Subestación Eléctrica de Caaguazú - ANDE (220 kV), about 4.1 km away.

How clean is the power for WILOHOSTING DATACENTER?

The grid in Paraguay emits about 25 g CO₂ per kWh (2025). Largest sources: hydro 99.4%, bioenergy 0.5%.

Who operates WILOHOSTING DATACENTER?

WILOHOSTING.

Data centers near Caaguazú

Sources

Correct this page or get the data