Yöncü Bilişim Çözümleri
Yöncü Bilişim Çözümleri is an operational data center operated by Yöncü Bilişim Çözümleri in Ümraniye, Türkiye. No power figure is public for this site yet.
Key facts
| Status | Operational |
|---|---|
| Operator | Yöncü Bilişim Çözümleri |
| Address | Yukari Dudullu Mahallesi, Bayrak Caddesi No 12 |
| Coordinates | 41.00879, 29.15524 |
| Website | yoncu.com.tr |
Power and grid
| Nearest high-voltage substation | Dudullu Metro TM, 154 kV, 700 m away (TEİAŞ) Straight-line distance. OpenStreetMap, substations of 100 kV and more. |
|---|---|
| Nearest 220 kV+ substation | TR1, 400 kV, 1.9 km away |
| HV substations within 10 km | 15 |
| Power plants within 50 km | 3.7 GW in 8 plants
Plants with a stated output in OpenStreetMap. The largest four are listed. |
| Grid carbon intensity | 476 g CO₂ per kWh (Türkiye, 2025) Average of all power made in the area. Ember. |
| Grid power mix | coal 34.3%, gas 22.1%, hydro 16.2%, wind 11.1%, solar 10.5%. Clean power: 43.3% |
| Industrial power price | EUR 0.054 per kWh (Türkiye, 2026-S1) Non-household users with 20 to 70 GWh per year, without VAT. Eurostat. |
Climate and water
| Average temperature | 15.2 °C NASA POWER, average of 2001 to 2025. |
|---|---|
| Highest temperature | 38.1 °C (2001 to 2025) |
| Cooling degree days | 730 per year (base 18.3 °C) More cooling degree days means more energy for cooling. |
| Solar energy | 4.05 kWh per m² per day |
| Wind at 50 m | 6.3 m/s average |
| Water stress today | High (40-80%) (Istanbul) Share of the local water supply that people already use. WRI Aqueduct 4.0, province level. |
| Water stress in 2050 | Extremely High (>80%) Business-as-usual scenario. |
Satellite view
Google satellite · Copernicus Sentinel-2 history · OpenStreetMap
Questions
How close is Yöncü Bilişim Çözümleri to the power grid?
The nearest high-voltage substation in OpenStreetMap is Dudullu Metro TM (154 kV), about 700 m away.
How clean is the power for Yöncü Bilişim Çözümleri?
The grid in Türkiye emits about 476 g CO₂ per kWh (2025). Largest sources: coal 34.3%, gas 22.1%, hydro 16.2%.
Who operates Yöncü Bilişim Çözümleri?
Yöncü Bilişim Çözümleri.
Data centers near Ümraniye
- Equinix IL4 - Istanbul 119 m
- Equinix IL2 - Istanbul 2.4 km
- Kuzey Veri Merkezi 2.8 km
- NETBUDUR Datacenter Istanbul 3.9 km
- Telehouse - Istanbul 6.1 km
- Netlen Istanbul 6.3 km
- Teknotel - Kucukyali 6.7 km
- NetFactor 9.4 km
Sources