国家超算互联网核心节点 is an operational data center in Zhengzhou, China. Our footprint estimate of its power is about 13 MW.
Key facts
| Status | Operational |
|---|---|
| Facility power | 13 MW (range 5 MW to 32 MW) Estimate from building footprint, low confidence. Footprint estimate: about 105,196 m² site outline x 0.12 kW per m² of land. |
| GPU capacity if all AI | about 5,600 GPUs If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count. |
| Coordinates | 34.80598, 113.75939 |
Power and grid
| Grid carbon intensity | 528 g CO₂ per kWh (China, 2025) Average of all power made in the area. Ember. |
|---|---|
| Grid power mix | coal 54.8%, hydro 13.3%, solar 11.2%, wind 10.7%, nuclear 4.6%. Clean power: 41.1% |
Climate and water
| Water stress today | Extremely High (>80%) (Henan) Share of the local water supply that people already use. WRI Aqueduct 4.0, province level. |
|---|---|
| Water stress in 2050 | High (40-80%) Business-as-usual scenario. |
Satellite view
Google satellite · Copernicus Sentinel-2 history · OpenStreetMap
Questions
How much power does 国家超算互联网核心节点 use?
We estimate the facility power at about 13 MW. Estimate from building footprint, low confidence.
How clean is the power for 国家超算互联网核心节点?
The grid in China emits about 528 g CO₂ per kWh (2025). Largest sources: coal 54.8%, hydro 13.3%, solar 11.2%.