Data Center Directory

3HCloud - ALA-1

3HCloud - ALA-1 is an operational data center operated by 3HCLOUD in Almaty, Kazakhstan. No power figure is public for this site yet.

Key facts

StatusOperational
Operator3HCLOUD
Address39A Divaeva street
Coordinates43.24094, 76.97747
Website3hcloud.com

Power and grid

Nearest high-voltage substationUnnamed substation, 110 kV, 2.7 km away
Straight-line distance. OpenStreetMap, substations of 100 kV and more.
Nearest 220 kV+ substationUnnamed substation, 220 kV, 7 km away
HV substations within 10 km11
Power plants within 50 km880 MW in 9 plants
Plants with a stated output in OpenStreetMap. The largest four are listed.
Grid carbon intensity812 g CO₂ per kWh (Kazakhstan, 2025)
Average of all power made in the area. Ember.
Grid power mixcoal 58.2%, gas 27%, hydro 8.4%, wind 4.1%, solar 1.8%. Clean power: 14.3%

Climate and water

Average temperature1.3 °C
NASA POWER, average of 2001 to 2025.
Highest temperature27.9 °C (2001 to 2025)
Cooling degree days3 per year (base 18.3 °C)
More cooling degree days means more energy for cooling.
Solar energy4.24 kWh per m² per day
Wind at 50 m3.2 m/s average
Water stress todayMedium - High (20-40%) (Almaty)
Share of the local water supply that people already use. WRI Aqueduct 4.0, province level.
Water stress in 2050Medium - High (20-40%)
Business-as-usual scenario.

Satellite view

Questions

How close is 3HCloud - ALA-1 to the power grid?

The nearest high-voltage substation in OpenStreetMap is an unnamed substation (110 kV), about 2.7 km away.

How clean is the power for 3HCloud - ALA-1?

The grid in Kazakhstan emits about 812 g CO₂ per kWh (2025). Largest sources: coal 58.2%, gas 27%, hydro 8.4%.

Who operates 3HCloud - ALA-1?

3HCLOUD.

Data centers near Almaty

More 3HCLOUD data centers

Sources

Correct this page or get the data

Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.