3HCloud - WAW-2 is an operational data center operated by 3HCLOUD in Warsaw, Poland. Our footprint estimate of its power is about 4.2 MW.
Key facts
| Status | Operational |
|---|---|
| Operator | 3HCLOUD |
| Facility power | 4.2 MW (range 1.7 MW to 10 MW) Estimate from building footprint, low confidence. Footprint estimate: about 34,902 m² site outline x 0.12 kW per m² of land. |
| GPU capacity if all AI | about 1,800 GPUs If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count. |
| Also known as | Atman Data Center Warsaw-1 |
| Address | 21A Grochowska St |
| Coordinates | 52.23659, 21.11736 |
| Website | 3hcloud.com |
Power and grid
| Nearest high-voltage substation | Stacja elektroenergetyczna 110/15 kV „RPZ Warszawa Olszynka Grochowska”, 110 kV, 1.3 km away (PGE Energetyka Kolejowa) Straight-line distance. OpenStreetMap, substations of 100 kV and more. |
|---|---|
| Nearest 220 kV+ substation | Stacja elektroenergetyczna 220/110/15 kV „SE Warszawa Towarowa”, 220 kV, 9.1 km away |
| HV substations within 10 km | 29 |
| Power plants within 50 km | 1.5 GW in 7 plants
Plants with a stated output in OpenStreetMap. The largest four are listed. |
| Grid carbon intensity | 591 g CO₂ per kWh (Poland, 2025) Average of all power made in the area. Ember. |
| Grid power mix | coal 50.6%, gas 14.4%, wind 13.9%, solar 11.3%, bioenergy 4.9%. Clean power: 31.2% |
| Industrial power price | EUR 0.169 per kWh (Poland, 2026-S1) Non-household users with 20 to 70 GWh per year, without VAT. Eurostat. |
Climate and water
| Average temperature | 8.6 °C NASA POWER, average of 2001 to 2025. |
|---|---|
| Highest temperature | 36.9 °C (2001 to 2025) |
| Cooling degree days | 200 per year (base 18.3 °C) More cooling degree days means more energy for cooling. |
| Solar energy | 2.98 kWh per m² per day |
| Wind at 50 m | 6.3 m/s average |
| Water stress today | Low - Medium (10-20%) (Poland) Share of the local water supply that people already use. WRI Aqueduct 4.0, country level. |
| Water stress in 2050 | Low - Medium (10-20%) Business-as-usual scenario. |
Satellite view
Google satellite · Copernicus Sentinel-2 history · OpenStreetMap
Questions
How much power does 3HCloud - WAW-2 use?
We estimate the facility power at about 4.2 MW. Estimate from building footprint, low confidence.
How close is 3HCloud - WAW-2 to the power grid?
The nearest high-voltage substation in OpenStreetMap is Stacja elektroenergetyczna 110/15 kV „RPZ Warszawa Olszynka Grochowska” (110 kV), about 1.3 km away.
How clean is the power for 3HCloud - WAW-2?
The grid in Poland emits about 591 g CO₂ per kWh (2025). Largest sources: coal 50.6%, gas 14.4%, wind 13.9%.
Who operates 3HCloud - WAW-2?
3HCLOUD.
Data centers near Warsaw
- ATMAN Data Center Warsaw-1 (WAW-1, Grochowska 21A) 408 m
- DC 11.11 6.4 km · 1.2 MW
- Netia Warsaw (WARSC001) 6.8 km
- T-Mobile Piękna 6.9 km
- Orange Polska / Warsaw św. Barbary 10 7.5 km
- MEVSPACE DC-2 7.6 km
- LIM Warsaw 7.7 km
- Equinix WA1 - Warsaw, Centrum LIM 7.8 km
More 3HCLOUD data centers
- 3HCloud - ALA-1 Kazakhstan
- 3HCloud - DFW-1 United States
- 3HCloud - WAW-1 Poland
Sources
Correct this page or get the data
Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.