3HCloud - WAW-2

3HCloud - WAW-2 is an operational data center operated by 3HCLOUD in Warsaw, Poland. Our footprint estimate of its power is about 4.2 MW.

Key facts

StatusOperational
Operator3HCLOUD
Facility power4.2 MW (range 1.7 MW to 10 MW)
Estimate from building footprint, low confidence. Footprint estimate: about 34,902 m² site outline x 0.12 kW per m² of land.
GPU capacity if all AIabout 1,800 GPUs
If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count.
Also known asAtman Data Center Warsaw-1
Address21A Grochowska St
Coordinates52.23659, 21.11736
Website3hcloud.com

Power and grid

Nearest high-voltage substationStacja elektroenergetyczna 110/15 kV „RPZ Warszawa Olszynka Grochowska”, 110 kV, 1.3 km away (PGE Energetyka Kolejowa)
Straight-line distance. OpenStreetMap, substations of 100 kV and more.
Nearest 220 kV+ substationStacja elektroenergetyczna 220/110/15 kV „SE Warszawa Towarowa”, 220 kV, 9.1 km away
HV substations within 10 km29
Power plants within 50 km1.5 GW in 7 plants
Plants with a stated output in OpenStreetMap. The largest four are listed.
Grid carbon intensity591 g CO₂ per kWh (Poland, 2025)
Average of all power made in the area. Ember.
Grid power mixcoal 50.6%, gas 14.4%, wind 13.9%, solar 11.3%, bioenergy 4.9%. Clean power: 31.2%
Industrial power priceEUR 0.169 per kWh (Poland, 2026-S1)
Non-household users with 20 to 70 GWh per year, without VAT. Eurostat.

Climate and water

Average temperature8.6 °C
NASA POWER, average of 2001 to 2025.
Highest temperature36.9 °C (2001 to 2025)
Cooling degree days200 per year (base 18.3 °C)
More cooling degree days means more energy for cooling.
Solar energy2.98 kWh per m² per day
Wind at 50 m6.3 m/s average
Water stress todayLow - Medium (10-20%) (Poland)
Share of the local water supply that people already use. WRI Aqueduct 4.0, country level.
Water stress in 2050Low - Medium (10-20%)
Business-as-usual scenario.

Satellite view

Questions

How much power does 3HCloud - WAW-2 use?

We estimate the facility power at about 4.2 MW. Estimate from building footprint, low confidence.

How close is 3HCloud - WAW-2 to the power grid?

The nearest high-voltage substation in OpenStreetMap is Stacja elektroenergetyczna 110/15 kV „RPZ Warszawa Olszynka Grochowska” (110 kV), about 1.3 km away.

How clean is the power for 3HCloud - WAW-2?

The grid in Poland emits about 591 g CO₂ per kWh (2025). Largest sources: coal 50.6%, gas 14.4%, wind 13.9%.

Who operates 3HCloud - WAW-2?

3HCLOUD.