Equinix WA1 - Warsaw, Centrum LIM is an operational data center operated by Equinix in Warsaw, Poland. No power figure is public for this site yet.
Key facts
| Status | Operational |
|---|---|
| Operator | Equinix |
| Networks | 254 networks, 13 internet exchanges PeeringDB. |
| Also known as | 1-DC EU |
| Address | 65/79 al. Jerozolimskie |
| Coordinates | 52.22735, 21.00336 |
| Website | equinix.com/locations/europe-colocation/poland-colocation/warsaw-data-centers/wa1 |
Power and grid
| Nearest high-voltage substation | Stacja elektroenergetyczna 110/15 kV „RPZ Warszawa Pałac”, 110 kV, 700 m away (Stoen Operator) Straight-line distance. OpenStreetMap, substations of 100 kV and more. |
|---|---|
| Nearest 220 kV+ substation | Stacja elektroenergetyczna 220/110/15 kV „SE Warszawa Towarowa”, 220 kV, 1.2 km away |
| HV substations within 10 km | 47 |
| Power plants within 50 km | 1.4 GW in 5 plants
Plants with a stated output in OpenStreetMap. The largest four are listed. |
| Grid carbon intensity | 591 g CO₂ per kWh (Poland, 2025) Average of all power made in the area. Ember. |
| Grid power mix | coal 50.6%, gas 14.4%, wind 13.9%, solar 11.3%, bioenergy 4.9%. Clean power: 31.2% |
| Industrial power price | EUR 0.169 per kWh (Poland, 2026-S1) Non-household users with 20 to 70 GWh per year, without VAT. Eurostat. |
Climate and water
| Average temperature | 8.6 °C NASA POWER, average of 2001 to 2025. |
|---|---|
| Highest temperature | 36.9 °C (2001 to 2025) |
| Cooling degree days | 200 per year (base 18.3 °C) More cooling degree days means more energy for cooling. |
| Solar energy | 2.98 kWh per m² per day |
| Wind at 50 m | 6.3 m/s average |
| Water stress today | Low - Medium (10-20%) (Poland) Share of the local water supply that people already use. WRI Aqueduct 4.0, country level. |
| Water stress in 2050 | Low - Medium (10-20%) Business-as-usual scenario. |
Satellite view
Google satellite · Copernicus Sentinel-2 history · OpenStreetMap
Questions
How close is Equinix WA1 - Warsaw, Centrum LIM to the power grid?
The nearest high-voltage substation in OpenStreetMap is Stacja elektroenergetyczna 110/15 kV „RPZ Warszawa Pałac” (110 kV), about 700 m away.
How clean is the power for Equinix WA1 - Warsaw, Centrum LIM?
The grid in Poland emits about 591 g CO₂ per kWh (2025). Largest sources: coal 50.6%, gas 14.4%, wind 13.9%.
Who operates Equinix WA1 - Warsaw, Centrum LIM?
Equinix.
Data centers near Warsaw
- LIM Warsaw 120 m
- EdgeConneX Warsaw (EDCWAW01) 287 m
- Orange Polska / Warsaw św. Barbary 10 383 m
- T-Mobile Piękna 1.1 km
- Netia Warsaw (WARSC001) 1.2 km
- ATMAN Data Center Warsaw-2 (WAW-2, Konstruktorska 5) 4.7 km
- DC 11.11 4.8 km · 1.2 MW
- EdgeConneX Warsaw (EDCWAW02) 6.3 km
More Equinix data centers
- Equinix DA1 - Dallas United States
- Equinix SP6 Brazil
- Equinix PH1 - Philadelphia United States
- Equinix PA13X France
- Equinix CH1/CH2/CH4 - Chicago United States
- Equinix CH3 - Elk Grove United States
- Equinix AM3 - Amsterdam, Science Park Netherlands
- Equinix LA1 - Los Angeles United States
Sources
Correct this page or get the data
Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.