Equinix CH3 - Elk Grove
Equinix CH3 - Elk Grove is an operational data center operated by Equinix in Elk Grove Village, United States. Our footprint estimate of its power is about 76 MW.
Key facts
| Status | Operational |
|---|---|
| Operator | Equinix |
| Facility power | 76 MW (range 38 MW to 121 MW) Estimate from building footprint, low confidence. Footprint estimate: about 15,738 m² building outline x 4 floor(s) x 1.2 kW/m². |
| GPU capacity if all AI | about 32,000 GPUs If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count. |
| Networks | 43 networks, 2 internet exchanges PeeringDB. |
| Also known as | Equinix Chicago CH3 |
| Address | 1905 Lunt Ave |
| Coordinates | 42.00117, -87.95488 |
| Website | equinix.com |
Power and grid
| Nearest high-voltage substation | Tonne 138kV Substation, 138 kV, 2 km away (Commonwealth Edison) Straight-line distance. OpenStreetMap, substations of 100 kV and more. |
|---|---|
| Nearest 220 kV+ substation | ComEd Itasca 138kV-345kV Substation, 345 kV, 4.1 km away |
| HV substations within 10 km | 18 |
| Utility | Commonwealth Edison Co (investor owned) Electric retail service territory (HIFLD, US government). |
| Balancing authority | PJM |
| Nearest gas pipeline | Natural Gas PL Co of Am, interstate pipeline, 900 m away US Energy Information Administration pipeline map. Straight-line distance. |
| Power plants within 50 km | 3.0 GW in 29 plants
Plants with a stated output in OpenStreetMap. The largest four are listed. |
| Grid carbon intensity | 247 g CO₂ per kWh (Illinois, 2025) Average of all power made in the area. Ember. |
| Grid power mix | nuclear 49.9%, gas 16.6%, coal 15.8%, wind 12.8%, solar 4.5%. Clean power: 67.3% |
| Industrial power price | USD 0.113 per kWh (Illinois, August 2026) Average price paid by industrial users in the state. EIA Electric Power Monthly. |
Climate and water
| Average temperature | 9.5 °C NASA POWER, average of 2001 to 2025. |
|---|---|
| Highest temperature | 40.5 °C (2001 to 2025) |
| Cooling degree days | 465 per year (base 18.3 °C) More cooling degree days means more energy for cooling. |
| Solar energy | 3.67 kWh per m² per day |
| Wind at 50 m | 6.8 m/s average |
| Water stress today | Medium - High (20-40%) (Illinois) Share of the local water supply that people already use. WRI Aqueduct 4.0, province level. |
| Water stress in 2050 | Medium - High (20-40%) Business-as-usual scenario. |
Satellite view
Google satellite · Copernicus Sentinel-2 history · OpenStreetMap
Questions
How much power does Equinix CH3 - Elk Grove use?
We estimate the facility power at about 76 MW. Estimate from building footprint, low confidence.
How close is Equinix CH3 - Elk Grove to the power grid?
The nearest high-voltage substation in OpenStreetMap is Tonne 138kV Substation (138 kV), about 2 km away. The local utility is Commonwealth Edison Co, in the PJM balancing area.
How clean is the power for Equinix CH3 - Elk Grove?
The grid in Illinois emits about 247 g CO₂ per kWh (2025). Largest sources: nuclear 49.9%, gas 16.6%, coal 15.8%.
Who operates Equinix CH3 - Elk Grove?
Equinix.
Data centers near Elk Grove Village
- EdgeConneX Chicago (EDCCHI02) 188 m · 22 MW
- Stream Data Centers - Chicago I 306 m · 15 MW
- Stream Data Centers - Chicago II 361 m · 19 MW
- Digital Realty CH2 - Chicago 811 m · 30 MW
- Digital Realty CH1 - Chicago 970 m · 149 MW
- Forsythe Data Centers 1.0 km · 28 MW
- Centersquare Chicago (ORD2) 1.0 km · 43 MW
- Stream Data Centers 1.1 km · 17 MW
More Equinix data centers
- Equinix DA1 - Dallas United States
- Equinix SP6 Brazil
- Equinix PH1 - Philadelphia United States
- Equinix PA13X France
- Equinix CH1/CH2/CH4 - Chicago United States
- Equinix AM3 - Amsterdam, Science Park Netherlands
- Equinix LA1 - Los Angeles United States
- Equinix MI1 - Miami, NOTA United States
Sources
Correct this page or get the data
Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.