Centersquare Chicago (ORD2) is an operational data center operated by Centersquare in Elk Grove Village, United States. Our footprint estimate of its power is about 43 MW.

Key facts

StatusOperational
OperatorCentersquare
Facility power43 MW (range 21 MW to 68 MW)
Estimate from building footprint, low confidence. Footprint estimate: about 17,811 m² building outline x 2 floor(s) x 1.2 kW/m².
GPU capacity if all AIabout 18,000 GPUs
If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count.
Networks9 networks, 1 internet exchanges
PeeringDB.
Also known asCentersquare Elk Grove Village Data Center Campus ORD2
Address2425 Busse Road Elk Grove Village
Coordinates41.99209, -87.95802
Websitecentersquaredc.com/data-centers/chicago

Power and grid

Nearest high-voltage substationTonne 138kV Substation, 138 kV, 1.7 km away (Commonwealth Edison)
Straight-line distance. OpenStreetMap, substations of 100 kV and more.
Nearest 220 kV+ substationComEd Itasca 138kV-345kV Substation, 345 kV, 3.4 km away
HV substations within 10 km19
UtilityCommonwealth Edison Co (investor owned)
Electric retail service territory (HIFLD, US government).
Balancing authorityPJM
Nearest gas pipelineNorthern Illinois Gas Co, intrastate pipeline, 1.7 km away
US Energy Information Administration pipeline map. Straight-line distance.
Power plants within 50 km3.0 GW in 29 plants
Plants with a stated output in OpenStreetMap. The largest four are listed.
Grid carbon intensity247 g CO₂ per kWh (Illinois, 2025)
Average of all power made in the area. Ember.
Grid power mixnuclear 49.9%, gas 16.6%, coal 15.8%, wind 12.8%, solar 4.5%. Clean power: 67.3%
Industrial power priceUSD 0.113 per kWh (Illinois, August 2026)
Average price paid by industrial users in the state. EIA Electric Power Monthly.

Climate and water

Average temperature9.5 °C
NASA POWER, average of 2001 to 2025.
Highest temperature40.5 °C (2001 to 2025)
Cooling degree days465 per year (base 18.3 °C)
More cooling degree days means more energy for cooling.
Solar energy3.67 kWh per m² per day
Wind at 50 m6.8 m/s average
Water stress todayMedium - High (20-40%) (Illinois)
Share of the local water supply that people already use. WRI Aqueduct 4.0, province level.
Water stress in 2050Medium - High (20-40%)
Business-as-usual scenario.

Satellite view

Questions

How much power does Centersquare Chicago (ORD2) use?

We estimate the facility power at about 43 MW. Estimate from building footprint, low confidence.

How close is Centersquare Chicago (ORD2) to the power grid?

The nearest high-voltage substation in OpenStreetMap is Tonne 138kV Substation (138 kV), about 1.7 km away. The local utility is Commonwealth Edison Co, in the PJM balancing area.

How clean is the power for Centersquare Chicago (ORD2)?

The grid in Illinois emits about 247 g CO₂ per kWh (2025). Largest sources: nuclear 49.9%, gas 16.6%, coal 15.8%.

Who operates Centersquare Chicago (ORD2)?

Centersquare.

Data centers near Elk Grove Village

More Centersquare data centers

Sources

Correct this page or get the data