Data Center Directory

Centersquare Atlanta (ATL1-A/B/C)

Centersquare Atlanta (ATL1-A/B/C) is an operational data center operated by Centersquare in Lithia Springs, United States. Our footprint estimate of its power is about 36 MW.

Key facts

StatusOperational
OperatorCentersquare
Facility power36 MW (range 18 MW to 58 MW)
Estimate from building footprint, low confidence. Footprint estimate: about 30,368 m² building outline x 1 floor(s) x 1.2 kW/m².
GPU capacity if all AIabout 15,000 GPUs
If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count.
Networks8 networks, 1 internet exchanges
PeeringDB.
Also known asCentersquare Atlanta (ATL1-D) · Centersquare Atlanta ATL1
Address375 Riverside Parkway
Coordinates33.74424, -84.58259
Websitecentersquaredc.com/data-centers/atlanta

Power and grid

Nearest high-voltage substationGoogle Substation, 230 kV, 800 m away (Georgia Power)
Straight-line distance. OpenStreetMap, substations of 100 kV and more.
HV substations within 10 km26
UtilityGreystone Power Corporation (cooperative)
Electric retail service territory (HIFLD, US government).
Balancing authoritySOCO
Nearest gas pipelineSouthern Natural Gas Co, interstate pipeline, 8.8 km away
US Energy Information Administration pipeline map. Straight-line distance.
Power plants within 50 km3.8 GW in 11 plants
Plants with a stated output in OpenStreetMap. The largest four are listed.
Grid carbon intensity352 g CO₂ per kWh (Georgia, 2025)
Average of all power made in the area. Ember.
Grid power mixgas 38.7%, nuclear 34.8%, coal 13.6%, solar 8.1%, bioenergy 3.2%. Clean power: 47.6%
Industrial power priceUSD 0.131 per kWh (Georgia, August 2026)
Average price paid by industrial users in the state. EIA Electric Power Monthly.

Climate and water

Average temperature16.7 °C
NASA POWER, average of 2001 to 2025.
Highest temperature42.4 °C (2001 to 2025)
Cooling degree days1,093 per year (base 18.3 °C)
More cooling degree days means more energy for cooling.
Solar energy4.51 kWh per m² per day
Wind at 50 m4.6 m/s average
Water stress todayMedium - High (20-40%) (Georgia)
Share of the local water supply that people already use. WRI Aqueduct 4.0, province level.
Water stress in 2050Medium - High (20-40%)
Business-as-usual scenario.

Satellite view

Questions

How much power does Centersquare Atlanta (ATL1-A/B/C) use?

We estimate the facility power at about 36 MW. Estimate from building footprint, low confidence.

How close is Centersquare Atlanta (ATL1-A/B/C) to the power grid?

The nearest high-voltage substation in OpenStreetMap is Google Substation (230 kV), about 800 m away. The local utility is Greystone Power Corporation, in the SOCO balancing area.

How clean is the power for Centersquare Atlanta (ATL1-A/B/C)?

The grid in Georgia emits about 352 g CO₂ per kWh (2025). Largest sources: gas 38.7%, nuclear 34.8%, coal 13.6%.

Who operates Centersquare Atlanta (ATL1-A/B/C)?

Centersquare.

Data centers near Lithia Springs

More Centersquare data centers

Sources

Correct this page or get the data

Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.