Data Center Directory

Amazon Web Services data center in Lithia Springs

Amazon Web Services data center in Lithia Springs is a data center under construction operated by Amazon Web Services in Lithia Springs, United States. Our footprint estimate of its power is about 51 MW. Likely chips: AWS Trainium and NVIDIA GPUs (guess).

Power demand is growing at this site

Key facts

StatusUnder construction
OperatorAmazon Web Services
Facility power51 MW (range 20 MW to 127 MW)
Estimate from building footprint, low confidence. Footprint estimate: about 422,791 m² site outline x 0.12 kW per m² of land.
AI chipsAWS Trainium and NVIDIA GPUs
Guess from the operator, not confirmed. AWS deploys its own Trainium chips next to NVIDIA GPUs.
GPU capacity if all AIabout 22,000 GPUs
If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count.
Coordinates33.74226, -84.60392

Power and grid

Nearest high-voltage substationUnnamed substation, 230 kV, 1.1 km away (Georgia Power)
Straight-line distance. OpenStreetMap, substations of 100 kV and more.
HV substations within 10 km23
UtilityGreystone Power Corporation (cooperative)
Electric retail service territory (HIFLD, US government).
Balancing authoritySOCO
Nearest gas pipelineSouthern Natural Gas Co, interstate pipeline, 7.5 km away
US Energy Information Administration pipeline map. Straight-line distance.
Power plants within 50 km3.8 GW in 10 plants
Plants with a stated output in OpenStreetMap. The largest four are listed.
Grid carbon intensity352 g CO₂ per kWh (Georgia, 2025)
Average of all power made in the area. Ember.
Grid power mixgas 38.7%, nuclear 34.8%, coal 13.6%, solar 8.1%, bioenergy 3.2%. Clean power: 47.6%
Industrial power priceUSD 0.131 per kWh (Georgia, August 2026)
Average price paid by industrial users in the state. EIA Electric Power Monthly.

Climate and water

Average temperature16.7 °C
NASA POWER, average of 2001 to 2025.
Highest temperature42.4 °C (2001 to 2025)
Cooling degree days1,093 per year (base 18.3 °C)
More cooling degree days means more energy for cooling.
Solar energy4.51 kWh per m² per day
Wind at 50 m4.6 m/s average
Water stress todayMedium - High (20-40%) (Georgia)
Share of the local water supply that people already use. WRI Aqueduct 4.0, province level.
Water stress in 2050Medium - High (20-40%)
Business-as-usual scenario.

Satellite view

Questions

How much power does Amazon Web Services data center in Lithia Springs use?

We estimate the facility power at about 51 MW. Estimate from building footprint, low confidence.

What chips does Amazon Web Services data center in Lithia Springs use?

No chips are reported. Based on the operator, the likely chips are AWS Trainium and NVIDIA GPUs.

How close is Amazon Web Services data center in Lithia Springs to the power grid?

The nearest high-voltage substation in OpenStreetMap is an unnamed substation (230 kV), about 1.1 km away. The local utility is Greystone Power Corporation, in the SOCO balancing area.

How clean is the power for Amazon Web Services data center in Lithia Springs?

The grid in Georgia emits about 352 g CO₂ per kWh (2025). Largest sources: gas 38.7%, nuclear 34.8%, coal 13.6%.

Who operates Amazon Web Services data center in Lithia Springs?

Amazon Web Services.

Data centers near Lithia Springs

More Amazon Web Services data centers

Sources

Correct this page or get the data

Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.