Flexential - Atlanta/Douglasville (ATL5) is an operational data center operated by Flexential in Douglasville, United States. Our footprint estimate of its power is about 54 MW.

Key facts

StatusOperational
OperatorFlexential
Facility power54 MW (range 27 MW to 86 MW)
Estimate from building footprint, low confidence. Footprint estimate: about 44,904 m² building outline x 1 floor(s) x 1.2 kW/m².
GPU capacity if all AIabout 23,000 GPUs
If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count.
Also known asDouglasville 1
Address1700 N. River Road
Coordinates33.73116, -84.61571
Websiteflexential.com

Power and grid

Nearest high-voltage substationUnnamed substation, 230 kV, 300 m away
Straight-line distance. OpenStreetMap, substations of 100 kV and more.
HV substations within 10 km21
UtilityGreystone Power Corporation (cooperative)
Electric retail service territory (HIFLD, US government).
Balancing authoritySOCO
Nearest gas pipelineSouthern Natural Gas Co, interstate pipeline, 6.3 km away
US Energy Information Administration pipeline map. Straight-line distance.
Power plants within 50 km3.8 GW in 10 plants
Plants with a stated output in OpenStreetMap. The largest four are listed.
Grid carbon intensity352 g CO₂ per kWh (Georgia, 2025)
Average of all power made in the area. Ember.
Grid power mixgas 38.7%, nuclear 34.8%, coal 13.6%, solar 8.1%, bioenergy 3.2%. Clean power: 47.6%
Industrial power priceUSD 0.131 per kWh (Georgia, August 2026)
Average price paid by industrial users in the state. EIA Electric Power Monthly.

Climate and water

Average temperature16.7 °C
NASA POWER, average of 2001 to 2025.
Highest temperature42.4 °C (2001 to 2025)
Cooling degree days1,093 per year (base 18.3 °C)
More cooling degree days means more energy for cooling.
Solar energy4.51 kWh per m² per day
Wind at 50 m4.6 m/s average
Water stress todayMedium - High (20-40%) (Georgia)
Share of the local water supply that people already use. WRI Aqueduct 4.0, province level.
Water stress in 2050Medium - High (20-40%)
Business-as-usual scenario.

Satellite view

Questions

How much power does Flexential - Atlanta/Douglasville (ATL5) use?

We estimate the facility power at about 54 MW. Estimate from building footprint, low confidence.

How close is Flexential - Atlanta/Douglasville (ATL5) to the power grid?

The nearest high-voltage substation in OpenStreetMap is an unnamed substation (230 kV), about 300 m away. The local utility is Greystone Power Corporation, in the SOCO balancing area.

How clean is the power for Flexential - Atlanta/Douglasville (ATL5)?

The grid in Georgia emits about 352 g CO₂ per kWh (2025). Largest sources: gas 38.7%, nuclear 34.8%, coal 13.6%.

Who operates Flexential - Atlanta/Douglasville (ATL5)?

Flexential.

Data centers near Douglasville

More Flexential data centers

Sources

Correct this page or get the data

Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.