Flexential - Denver/Englewood (DEN11)
Flexential - Denver/Englewood (DEN11) is an operational data center operated by Flexential in Englewood, United States. Our footprint estimate of its power is about 24 MW.
Key facts
| Status | Operational |
|---|---|
| Operator | Flexential |
| Facility power | 24 MW (range 12 MW to 39 MW) Estimate from building footprint, low confidence. Footprint estimate: about 20,330 m² building outline x 1 floor(s) x 1.2 kW/m². |
| GPU capacity if all AI | about 10,000 GPUs If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count. |
| Networks | 8 networks, 1 internet exchanges PeeringDB. |
| Also known as | Flexential Denver - Englewood |
| Address | 8636 S Peoria St |
| Coordinates | 39.55905, -104.83860 |
| Website | flexential.com |
Power and grid
| Nearest high-voltage substation | Unnamed substation, 115 kV, 2.4 km away (Core Electric Cooperative) Straight-line distance. OpenStreetMap, substations of 100 kV and more. |
|---|---|
| Nearest 220 kV+ substation | Surrey Ridge Substation, 230 kV, 4.3 km away |
| HV substations within 10 km | 19 |
| Utility | Core Electric Cooperative (cooperative) Electric retail service territory (HIFLD, US government). |
| Balancing authority | PSCO |
| Nearest gas pipeline | Colorado Interstate Gas Co, interstate pipeline, 5.4 km away US Energy Information Administration pipeline map. Straight-line distance. |
| Power plants within 50 km | 3.9 GW in 51 plants
Plants with a stated output in OpenStreetMap. The largest four are listed. |
| Grid carbon intensity | 400 g CO₂ per kWh (Colorado, 2025) Average of all power made in the area. Ember. |
| Grid power mix | gas 30.6%, wind 29%, coal 23.7%, solar 13.2%, hydro 3.2%. Clean power: 45.6% |
| Industrial power price | USD 0.100 per kWh (Colorado, August 2026) Average price paid by industrial users in the state. EIA Electric Power Monthly. |
Climate and water
| Average temperature | 9.1 °C NASA POWER, average of 2001 to 2025. |
|---|---|
| Highest temperature | 37.1 °C (2001 to 2025) |
| Cooling degree days | 315 per year (base 18.3 °C) More cooling degree days means more energy for cooling. |
| Solar energy | 4.85 kWh per m² per day |
| Wind at 50 m | 5.6 m/s average |
| Water stress today | Extremely High (>80%) (Colorado) Share of the local water supply that people already use. WRI Aqueduct 4.0, province level. |
| Water stress in 2050 | Extremely High (>80%) Business-as-usual scenario. |
Satellite view
Google satellite · Copernicus Sentinel-2 history · OpenStreetMap
Questions
How much power does Flexential - Denver/Englewood (DEN11) use?
We estimate the facility power at about 24 MW. Estimate from building footprint, low confidence.
How close is Flexential - Denver/Englewood (DEN11) to the power grid?
The nearest high-voltage substation in OpenStreetMap is an unnamed substation (115 kV), about 2.4 km away. The local utility is Core Electric Cooperative, in the PSCO balancing area.
How clean is the power for Flexential - Denver/Englewood (DEN11)?
The grid in Colorado emits about 400 g CO₂ per kWh (2025). Largest sources: gas 30.6%, wind 29%, coal 23.7%.
Who operates Flexential - Denver/Englewood (DEN11)?
Flexential.
Data centers near Englewood
- US Signal CO01 - Denver 434 m · 2.9 MW
- Centersquare Denver (DEN2) 704 m · 6.7 MW
- EdgeConnex - DEN02 920 m · 11 MW
- EdgeConneX Denver (EDCDEN01) 1.0 km
- Equinix DE2 - Denver 1.6 km
- DataBank Denver (DEN1) 2.5 km · 1.3 MW
- Xfinity/Comcast Data Center 3.3 km · 5.4 MW
- DataBank Denver (DEN2) 3.7 km · 9.2 MW
More Flexential data centers
- Douglasville 2 United States
- Flexential - Atlanta/Douglasville (ATL5) United States
- Flexential - Portland/Hillsboro 3 (PDX03) United States
- Flexential - Dallas/Plano (DFW01) United States
- Flexential - Portland/Hillsboro 2 (PDX02) United States
- Flexential Dallas - Richardson United States
- Flexential - Portland/Hillsboro 4 (PDX04) United States
- Flexential - Phoenix (PHX01) United States
Sources
Correct this page or get the data
Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.