Flexential - Portland/Hillsboro 2 (PDX02)
Flexential - Portland/Hillsboro 2 (PDX02) is an operational data center operated by Flexential in Hillsboro, United States. Our footprint estimate of its power is about 24 MW.
Key facts
| Status | Operational |
|---|---|
| Operator | Flexential |
| Facility power | 24 MW (range 12 MW to 38 MW) Estimate from building footprint, low confidence. Footprint estimate: about 19,671 m² building outline x 1 floor(s) x 1.2 kW/m². |
| GPU capacity if all AI | about 10,000 GPUs If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count. |
| Networks | 23 networks, 1 internet exchanges PeeringDB. |
| Also known as | Flexential Portland - Hillsboro 2 |
| Address | 5737 NE Huffman St |
| Coordinates | 45.55785, -122.91702 |
| Website | flexential.com |
Power and grid
| Nearest high-voltage substation | Sunset Substation, 230 kV, 600 m away (Portland General Electric) Straight-line distance. OpenStreetMap, substations of 100 kV and more. |
|---|---|
| HV substations within 10 km | 12 |
| Utility | Portland General Electric Co (investor owned) Electric retail service territory (HIFLD, US government). |
| Balancing authority | PGE |
| Nearest gas pipeline | Northwest Pipeline, interstate pipeline, 13.4 km away US Energy Information Administration pipeline map. Straight-line distance. |
| Power plants within 50 km | 818 MW in 33 plants
Plants with a stated output in OpenStreetMap. The largest four are listed. |
| Grid carbon intensity | 200 g CO₂ per kWh (Oregon, 2025) Average of all power made in the area. Ember. |
| Grid power mix | hydro 44.6%, gas 33.9%, wind 14.5%, solar 5.2%, bioenergy 1.6%. Clean power: 66.2% |
| Industrial power price | USD 0.087 per kWh (Oregon, August 2026) Average price paid by industrial users in the state. EIA Electric Power Monthly. |
Climate and water
| Average temperature | 10 °C NASA POWER, average of 2001 to 2025. |
|---|---|
| Highest temperature | 39.3 °C (2001 to 2025) |
| Cooling degree days | 79 per year (base 18.3 °C) More cooling degree days means more energy for cooling. |
| Solar energy | 3.67 kWh per m² per day |
| Wind at 50 m | 4 m/s average |
| Water stress today | Low - Medium (10-20%) (Oregon) Share of the local water supply that people already use. WRI Aqueduct 4.0, province level. |
| Water stress in 2050 | Low - Medium (10-20%) Business-as-usual scenario. |
Satellite view
Google satellite · Copernicus Sentinel-2 history · OpenStreetMap
Questions
How much power does Flexential - Portland/Hillsboro 2 (PDX02) use?
We estimate the facility power at about 24 MW. Estimate from building footprint, low confidence.
How close is Flexential - Portland/Hillsboro 2 (PDX02) to the power grid?
The nearest high-voltage substation in OpenStreetMap is Sunset Substation (230 kV), about 600 m away. The local utility is Portland General Electric Co, in the PGE balancing area.
How clean is the power for Flexential - Portland/Hillsboro 2 (PDX02)?
The grid in Oregon emits about 200 g CO₂ per kWh (2025). Largest sources: hydro 44.6%, gas 33.9%, wind 14.5%.
Who operates Flexential - Portland/Hillsboro 2 (PDX02)?
Flexential.
Data centers near Hillsboro
- EdgeConneX - Portland POR03 407 m · 8.4 MW
- QTS Hillsboro (HIL1) 794 m
- QTS Data Center - Hillsboro 1 843 m · 17 MW
- Meta-QTS Hillsboro 2 986 m · 243 MW
- Digital Realty PDX11 Data Center 1.1 km · 27 MW
- QTS Data Center - Hillsboro 2 1.2 km · 18 MW
- Digital Realty PDX11 Data Center 1.2 km · 27 MW
- Stack Infrastructure - POR01 1.3 km · 9.4 MW
More Flexential data centers
- Douglasville 2 United States
- Flexential - Atlanta/Douglasville (ATL5) United States
- Flexential - Portland/Hillsboro 3 (PDX03) United States
- Flexential - Dallas/Plano (DFW01) United States
- Flexential - Denver/Englewood (DEN11) United States
- Flexential Dallas - Richardson United States
- Flexential - Portland/Hillsboro 4 (PDX04) United States
- Flexential - Phoenix (PHX01) United States
Sources
Correct this page or get the data
Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.