Stack Infrastructure - POR01 is an operational data center operated by STACK Infrastructure in Hillsboro, United States. Our footprint estimate of its power is about 9.4 MW.
Key facts
| Status | Operational |
|---|---|
| Operator | STACK Infrastructure |
| Facility power | 9.4 MW (range 4.7 MW to 15 MW) Estimate from building footprint, low confidence. Footprint estimate: about 7,803 m² building outline x 1 floor(s) x 1.2 kW/m². |
| GPU capacity if all AI | about 4,000 GPUs If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count. |
| Address | Northeast Brookwood Parkway 3145, 97124, Hillsboro |
| Coordinates | 45.54933, -122.92782 |
| Website | stackinfra.com/locations/americas/portland/por01 |
Power and grid
| Utility | Portland General Electric Co (investor owned) Electric retail service territory (HIFLD, US government). |
|---|---|
| Balancing authority | PGE |
| Nearest gas pipeline | Northwest Pipeline, interstate pipeline, 14.6 km away US Energy Information Administration pipeline map. Straight-line distance. |
| Grid carbon intensity | 200 g CO₂ per kWh (Oregon, 2025) Average of all power made in the area. Ember. |
| Grid power mix | hydro 44.6%, gas 33.9%, wind 14.5%, solar 5.2%, bioenergy 1.6%. Clean power: 66.2% |
| Industrial power price | USD 0.087 per kWh (Oregon, August 2026) Average price paid by industrial users in the state. EIA Electric Power Monthly. |
Climate and water
| Average temperature | 10 °C NASA POWER, average of 2001 to 2025. |
|---|---|
| Highest temperature | 39.3 °C (2001 to 2025) |
| Cooling degree days | 79 per year (base 18.3 °C) More cooling degree days means more energy for cooling. |
| Solar energy | 3.67 kWh per m² per day |
| Wind at 50 m | 4 m/s average |
| Water stress today | Low - Medium (10-20%) (Oregon) Share of the local water supply that people already use. WRI Aqueduct 4.0, province level. |
| Water stress in 2050 | Low - Medium (10-20%) Business-as-usual scenario. |
Satellite view
Google satellite · Copernicus Sentinel-2 history · OpenStreetMap
Questions
How much power does Stack Infrastructure - POR01 use?
We estimate the facility power at about 9.4 MW. Estimate from building footprint, low confidence.
How clean is the power for Stack Infrastructure - POR01?
The grid in Oregon emits about 200 g CO₂ per kWh (2025). Largest sources: hydro 44.6%, gas 33.9%, wind 14.5%.
Who operates Stack Infrastructure - POR01?
STACK Infrastructure.
Data centers near Hillsboro
- Adobe Data Center 315 m · 11 MW
- RagingWire HI1 - NTT 753 m · 30 MW
- HLBOORXH - Hawthorne Central Office 761 m
- NTT RagingWire DC - Hillsboro 789 m · 22 MW
- QTS Hillsboro (HIL1) 874 m
- STACK Infrastructure data center in Hillsboro 888 m · 6.9 MW
- QTS Data Center - Hillsboro 1 1.1 km · 17 MW
- Meta-QTS Hillsboro 2 1.1 km · 243 MW
More STACK Infrastructure data centers
- STACK Infrastructure NVA02 United States
- STACK NVA05B United States
- STACK NVA06 United States
- STACK NVA02E United States
- STACK NVA02x United States
- STACK NVA05A United States
- Stack Infrastructure Portland PORO2 United States
- STACK NVA01A United States
Sources
Correct this page or get the data
Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.