Data Center Directory

STACK NVA05B

STACK NVA05B is an operational data center operated by STACK Infrastructure in Manassas, United States. Its power is about 62 MW.

Key facts

StatusOperational
OperatorSTACK Infrastructure
Facility power62 MW
Derived from a tagged IT power value. IT power tag in OpenStreetMap
IT power48 MW
GPU capacity if all AIabout 27,000 GPUs
If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count.
Also known asSTACK NVA05C
AddressFreedom Center Boulevard 9001, 20110, Manassas
Coordinates38.76109, -77.51435
Websitestackinfra.com/locations/americas/northern-virginia/nva05

Power and grid

UtilityNorthern Virginia Elec Coop (cooperative)
Electric retail service territory (HIFLD, US government).
Balancing authorityPJM
Nearest gas pipelineTranscontinental Gas PL, interstate pipeline, 2.5 km away
US Energy Information Administration pipeline map. Straight-line distance.
Grid carbon intensity357 g CO₂ per kWh (Virginia, 2025)
Average of all power made in the area. Ember.
Grid power mixgas 56.7%, nuclear 26.4%, solar 9.5%, coal 3.4%, bioenergy 3.3%. Clean power: 39%
Industrial power priceUSD 0.100 per kWh (Virginia, August 2026)
Average price paid by industrial users in the state. EIA Electric Power Monthly.

Climate and water

Average temperature12.8 °C
NASA POWER, average of 2001 to 2025.
Highest temperature40.7 °C (2001 to 2025)
Cooling degree days729 per year (base 18.3 °C)
More cooling degree days means more energy for cooling.
Solar energy3.98 kWh per m² per day
Wind at 50 m5.3 m/s average
Water stress todayMedium - High (20-40%) (Virginia)
Share of the local water supply that people already use. WRI Aqueduct 4.0, province level.
Water stress in 2050Medium - High (20-40%)
Business-as-usual scenario.

Satellite view

Questions

How much power does STACK NVA05B use?

Public data puts the facility power at about 62 MW. Derived from a tagged IT power value.

How clean is the power for STACK NVA05B?

The grid in Virginia emits about 357 g CO₂ per kWh (2025). Largest sources: gas 56.7%, nuclear 26.4%, solar 9.5%.

Who operates STACK NVA05B?

STACK Infrastructure.

Data centers near Manassas

More STACK Infrastructure data centers

Sources

Correct this page or get the data

Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.