STACK Infrastructure NVA02
STACK Infrastructure NVA02 is an operational data center that is still expanding, operated by STACK Infrastructure in Manassas, United States. Its power is about 118 MW, growing to about 487 MW by 2028-01. Epoch AI estimates about 61,000 H100-equivalent AI chips (H100).
Power demand is growing at this site
Key facts
| Status | Operational, expanding |
|---|---|
| Operator | STACK Infrastructure |
| Facility power | 118 MW Reported (Epoch AI or owner data) |
| IT power | 85 MW |
| Planned power | 487 MW by 2028-01-01 Epoch AI timeline projection. |
| AI compute | 61,000 H100-equivalents → 251,000 planned |
| AI chips | H100 Reported (Epoch AI or owner data) |
| GPU capacity if all AI | about 47,000 GPUs If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count. |
| Capital cost | USD 3.2 billion → 13.2 billion planned Epoch AI estimate, 2025 USD. |
| Also known as | STACK NVA02D |
| Address | 9590 Hornbaker Rd, Manassas, VA 20109 |
| Coordinates | 38.74637, -77.53687 |
Build timeline
| Date | Power | H100e | What the satellite images and filings show |
|---|---|---|---|
| 2019-10-19 | 0 | 0 | Land clearing begins by Peterson Companies for Stack Infrastructure, which is noted in the [news](https://www.bisnow.com/washington-dc/news/data-center/peterson-cos-partnering-to-build-4m-sf-data-center-campus-in-manassas-102646) and visible on satellite imagery. |
| 2024-10-01 | 118 MW | 61,000 | Building 1 is operational, which is assumed to be three months after the last backup diesel generators are finished. The generators were first seen to be finished July 1 from satellite imagery [(a clear image of this can be seen on July 29 via Google Earth).](https://earth.google.com/web/search/38%c2%b044%2745%2e12%22N+77%c2%b032%2716%2e47%22W/@38.7458667,-77.5379083,83.89135729a,642.01325639d,35y,0h,0t,0r/data=CjQiJgokCTo0Rh9P7TVAETk0Rh9P7TXAGX6C6a6li0VAIQ_0AAa-ik7AKgYIARIAGAFCAggBQgIIAEoNCP___________wEQAA) |
| 2026-02-14 | 118 MW | 61,000 | All buildings have begun construction (with groundwork starting for AI building 6), as depicted by satellite imagery. |
| 2028-01-01 (projected) | 487 MW | 251,000 | Estimate: All 6 AI data center buildings will be finished in 2028, assuming a groundbreak-to-operational timeline of 18-24 months. One is complete, three are clearly under construction, and the last two data centers are still breaking ground and laying foundations. |
Source: Epoch AI Frontier Data Centers.
Chip deployments
| Date | Chip | Units | Basis |
|---|---|---|---|
| 2024-10-01 | H100 | 60,911 | Estimate |
Satellite view
Google satellite · Copernicus Sentinel-2 history · OpenStreetMap
Questions
How much power does STACK Infrastructure NVA02 use?
Public data puts the facility power at about 118 MW, with about 487 MW planned by 2028. Reported (Epoch AI or owner data).
What chips does STACK Infrastructure NVA02 use?
Reported chips: H100.
Who operates STACK Infrastructure NVA02?
STACK Infrastructure.
Data centers near Manassas
- STACK NVA02E 158 m · 51 MW
- STACK NVA02x 214 m · 47 MW
- EvoSwitch WDC1 461 m · 19 MW
- STACK NVA02A 477 m · 21 MW
- Amazon IAD-132 608 m · 26 MW
- Amazon IAD-105 1.5 km · 62 MW
- Data center in Linton Hall 1.7 km · 17 MW
- AWS 1.7 km · 61 MW
More STACK Infrastructure data centers
- STACK NVA05B United States
- STACK NVA06 United States
- STACK NVA02E United States
- STACK NVA02x United States
- STACK NVA05A United States
- Stack Infrastructure Portland PORO2 United States
- STACK NVA01A United States
- STACK NVA02A United States
Sources
Correct this page or get the data
Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.