Data center in Linton Hall
Data center in Linton Hall is a data center under construction in Linton Hall, United States. Our footprint estimate of its power is about 17 MW.
Key facts
| Status | Under construction |
|---|---|
| Facility power | 17 MW (range 8.5 MW to 27 MW) Estimate from building footprint, low confidence. Footprint estimate: about 14,173 m² building outline x 1 floor(s) x 1.2 kW/m². |
| GPU capacity if all AI | about 7,300 GPUs If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count. |
| Coordinates | 38.76138, -77.53925 |
Power and grid
| Nearest high-voltage substation | Wellington Delivery Point, 115 kV, 1.1 km away Straight-line distance. OpenStreetMap, substations of 100 kV and more. |
|---|---|
| Nearest 220 kV+ substation | Liberty Substation, 230 kV, 1.5 km away |
| HV substations within 10 km | 47 |
| Utility | Northern Virginia Elec Coop (cooperative) Electric retail service territory (HIFLD, US government). |
| Balancing authority | PJM |
| Nearest gas pipeline | Transcontinental Gas PL, interstate pipeline, 800 m away US Energy Information Administration pipeline map. Straight-line distance. |
| Power plants within 50 km | 3.1 GW in 28 plants
Plants with a stated output in OpenStreetMap. The largest four are listed. |
| Grid carbon intensity | 357 g CO₂ per kWh (Virginia, 2025) Average of all power made in the area. Ember. |
| Grid power mix | gas 56.7%, nuclear 26.4%, solar 9.5%, coal 3.4%, bioenergy 3.3%. Clean power: 39% |
| Industrial power price | USD 0.100 per kWh (Virginia, August 2026) Average price paid by industrial users in the state. EIA Electric Power Monthly. |
Climate and water
| Average temperature | 12.8 °C NASA POWER, average of 2001 to 2025. |
|---|---|
| Highest temperature | 40.7 °C (2001 to 2025) |
| Cooling degree days | 729 per year (base 18.3 °C) More cooling degree days means more energy for cooling. |
| Solar energy | 3.98 kWh per m² per day |
| Wind at 50 m | 5.3 m/s average |
| Water stress today | Medium - High (20-40%) (Virginia) Share of the local water supply that people already use. WRI Aqueduct 4.0, province level. |
| Water stress in 2050 | Medium - High (20-40%) Business-as-usual scenario. |
Satellite view
Google satellite · Copernicus Sentinel-2 history · OpenStreetMap
Questions
How much power does Data center in Linton Hall use?
We estimate the facility power at about 17 MW. Estimate from building footprint, low confidence.
How close is Data center in Linton Hall to the power grid?
The nearest high-voltage substation in OpenStreetMap is Wellington Delivery Point (115 kV), about 1.1 km away. The local utility is Northern Virginia Elec Coop, in the PJM balancing area.
How clean is the power for Data center in Linton Hall?
The grid in Virginia emits about 357 g CO₂ per kWh (2025). Largest sources: gas 56.7%, nuclear 26.4%, solar 9.5%.
Data centers near Linton Hall
- Data center in Linton Hall 208 m · 5.3 MW
- Iron Mountain Data Center - Manassas (VA-2) 984 m · 34 MW
- Iron Mountain VA-5 1.3 km · 20 MW
- STACK NVA02x 1.5 km · 47 MW
- Iron Mountain VA-7 1.5 km · 33 MW
- Iron Mountain VA-3 1.7 km · 37 MW
- EvoSwitch WDC1 1.7 km · 19 MW
- STACK Infrastructure NVA02 1.7 km · 118 MW
Sources
Correct this page or get the data