NTT RagingWire DC - Hillsboro
NTT RagingWire DC - Hillsboro is an operational data center operated by NTT Global Data Centers in Hillsboro, United States. Our footprint estimate of its power is about 22 MW.
Key facts
| Status | Operational |
|---|---|
| Operator | NTT Global Data Centers |
| Facility power | 22 MW (range 11 MW to 35 MW) Estimate from building footprint, low confidence. Footprint estimate: about 18,062 m² building outline x 1 floor(s) x 1.2 kW/m². |
| GPU capacity if all AI | about 9,400 GPUs If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count. |
| Address | Northeast Dawson Creek Drive 4510, 97124, Hillsboro |
| Coordinates | 45.54808, -122.93779 |
Power and grid
| Nearest high-voltage substation | Shute Substation, 115 kV, 1.1 km away (Portland General Electric) Straight-line distance. OpenStreetMap, substations of 100 kV and more. |
|---|---|
| Nearest 220 kV+ substation | Evergreen Substation West, 230 kV, 1.3 km away |
| HV substations within 10 km | 12 |
| Utility | Portland General Electric Co (investor owned) Electric retail service territory (HIFLD, US government). |
| Balancing authority | PGE |
| Nearest gas pipeline | Northwest Pipeline, interstate pipeline, 15.4 km away US Energy Information Administration pipeline map. Straight-line distance. |
| Power plants within 50 km | 825 MW in 35 plants
Plants with a stated output in OpenStreetMap. The largest four are listed. |
| Grid carbon intensity | 200 g CO₂ per kWh (Oregon, 2025) Average of all power made in the area. Ember. |
| Grid power mix | hydro 44.6%, gas 33.9%, wind 14.5%, solar 5.2%, bioenergy 1.6%. Clean power: 66.2% |
| Industrial power price | USD 0.087 per kWh (Oregon, August 2026) Average price paid by industrial users in the state. EIA Electric Power Monthly. |
Climate and water
| Average temperature | 10 °C NASA POWER, average of 2001 to 2025. |
|---|---|
| Highest temperature | 39.3 °C (2001 to 2025) |
| Cooling degree days | 79 per year (base 18.3 °C) More cooling degree days means more energy for cooling. |
| Solar energy | 3.67 kWh per m² per day |
| Wind at 50 m | 4 m/s average |
| Water stress today | Low - Medium (10-20%) (Oregon) Share of the local water supply that people already use. WRI Aqueduct 4.0, province level. |
| Water stress in 2050 | Low - Medium (10-20%) Business-as-usual scenario. |
Satellite view
Google satellite · Copernicus Sentinel-2 history · OpenStreetMap
Questions
How much power does NTT RagingWire DC - Hillsboro use?
We estimate the facility power at about 22 MW. Estimate from building footprint, low confidence.
How close is NTT RagingWire DC - Hillsboro to the power grid?
The nearest high-voltage substation in OpenStreetMap is Shute Substation (115 kV), about 1.1 km away. The local utility is Portland General Electric Co, in the PGE balancing area.
How clean is the power for NTT RagingWire DC - Hillsboro?
The grid in Oregon emits about 200 g CO₂ per kWh (2025). Largest sources: hydro 44.6%, gas 33.9%, wind 14.5%.
Who operates NTT RagingWire DC - Hillsboro?
NTT Global Data Centers.
Data centers near Hillsboro
- RagingWire HI1 - NTT 161 m · 30 MW
- HLBOORXH - Hawthorne Central Office 370 m
- Adobe Data Center 531 m · 11 MW
- STACK Infrastructure data center in Hillsboro 542 m · 6.9 MW
- Stack Infrastructure - POR03 723 m · 8.6 MW
- Stack Infrastructure - POR01 789 m · 9.4 MW
- Flexential - Portland/Hillsboro 4 (PDX04) 796 m · 21 MW
- T5@Portland 844 m
More NTT Global Data Centers data centers
- NTT VA10 United States
- NTT Frankfurt 2 Data Center (FRA2) Germany
- NTT PH1 Datacenter United States
- NTT Japan
- NTTData Data Center United States
- NTT Hemel Hempstead 4 Data Center (HH4) United Kingdom
- NTT Berlin 1 Data Center (BER1) Germany
- NTT London 1 United Kingdom
Sources
Correct this page or get the data
Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.