Data Center Directory

NTT Berlin 1 Data Center (BER1)

NTT Berlin 1 Data Center (BER1) is an operational data center operated by NTT Global Data Centers in Berlin, Germany. Our footprint estimate of its power is about 23 MW.

Key facts

StatusOperational
OperatorNTT Global Data Centers
Facility power23 MW (range 12 MW to 37 MW)
Estimate from building footprint, low confidence. Footprint estimate: about 19,317 m² building outline x 1 floor(s) x 1.2 kW/m².
GPU capacity if all AIabout 9,800 GPUs
If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count.
Networks62 networks, 4 internet exchanges
PeeringDB.
AddressNonnendammallee 15
Coordinates52.53848, 13.23714
Websitedatacenter.hello.global.ntt/en/location/berlin/berlin-1-data-center

Power and grid

Nearest high-voltage substationUmspannwerk Uklei, 110 kV, 400 m away (Stromnetz Berlin)
Straight-line distance. OpenStreetMap, substations of 100 kV and more.
Nearest 220 kV+ substationUmspannwerk Reuter, 380 kV, 1.1 km away
HV substations within 10 km57
Power plants within 50 km3.2 GW in 52 plants
Plants with a stated output in OpenStreetMap. The largest four are listed.
Grid carbon intensity334 g CO₂ per kWh (Germany, 2025)
Average of all power made in the area. Ember.
Grid power mixwind 26.6%, coal 21%, solar 18%, gas 16.8%, bioenergy 10.1%. Clean power: 58.5%
Industrial power priceEUR 0.146 per kWh (Germany, 2026-S1)
Non-household users with 20 to 70 GWh per year, without VAT. Eurostat.

Climate and water

Average temperature9.7 °C
NASA POWER, average of 2001 to 2025.
Highest temperature37.7 °C (2001 to 2025)
Cooling degree days203 per year (base 18.3 °C)
More cooling degree days means more energy for cooling.
Solar energy2.83 kWh per m² per day
Wind at 50 m6.5 m/s average
Water stress todayMedium - High (20-40%) (Germany)
Share of the local water supply that people already use. WRI Aqueduct 4.0, country level.
Water stress in 2050Medium - High (20-40%)
Business-as-usual scenario.

Satellite view

Questions

How much power does NTT Berlin 1 Data Center (BER1) use?

We estimate the facility power at about 23 MW. Estimate from building footprint, low confidence.

How close is NTT Berlin 1 Data Center (BER1) to the power grid?

The nearest high-voltage substation in OpenStreetMap is Umspannwerk Uklei (110 kV), about 400 m away.

How clean is the power for NTT Berlin 1 Data Center (BER1)?

The grid in Germany emits about 334 g CO₂ per kWh (2025). Largest sources: wind 26.6%, coal 21%, solar 18%.

Who operates NTT Berlin 1 Data Center (BER1)?

NTT Global Data Centers.

Data centers near Berlin

More NTT Global Data Centers data centers

Sources

Correct this page or get the data

Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.