NTT PH1 Datacenter
NTT PH1 Datacenter is an operational data center operated by NTT Global Data Centers in Mesa, United States. Our footprint estimate of its power is about 33 MW.
Key facts
| Status | Operational |
|---|---|
| Operator | NTT Global Data Centers |
| Facility power | 33 MW (range 13 MW to 82 MW) Estimate from building footprint, low confidence. Footprint estimate: about 272,936 m² site outline x 0.12 kW per m² of land. |
| GPU capacity if all AI | about 14,000 GPUs If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count. |
| Address | East Elliot Road 10256, 85212, Mesa |
| Coordinates | 33.35367, -111.61241 |
| Website | services.global.ntt/en-us/services-and-products/global-data-centers/global-locations/americas/phoenix-ph1-data-center |
Power and grid
| Utility | City Of Mesa (municipal) Electric retail service territory (HIFLD, US government). |
|---|---|
| Balancing authority | WALC |
| Nearest gas pipeline | El Paso Natural Gas Co, interstate pipeline, 12.8 km away US Energy Information Administration pipeline map. Straight-line distance. |
| Grid carbon intensity | 311 g CO₂ per kWh (Arizona, 2025) Average of all power made in the area. Ember. |
| Grid power mix | gas 43%, nuclear 25.6%, solar 17.5%, coal 7.5%, hydro 4.1%. Clean power: 49.8% |
| Industrial power price | USD 0.097 per kWh (Arizona, August 2026) Average price paid by industrial users in the state. EIA Electric Power Monthly. |
Climate and water
| Water stress today | Extremely High (>80%) (Arizona) Share of the local water supply that people already use. WRI Aqueduct 4.0, province level. |
|---|---|
| Water stress in 2050 | Extremely High (>80%) Business-as-usual scenario. |
Satellite view
Google satellite · Copernicus Sentinel-2 history · OpenStreetMap
Questions
How much power does NTT PH1 Datacenter use?
We estimate the facility power at about 33 MW. Estimate from building footprint, low confidence.
How clean is the power for NTT PH1 Datacenter?
The grid in Arizona emits about 311 g CO₂ per kWh (2025). Largest sources: gas 43%, nuclear 25.6%, solar 17.5%.
Who operates NTT PH1 Datacenter?
NTT Global Data Centers.
Data centers near Mesa
- Apple Mesa Data Center 1.1 km · 36 MW
- EdgeCore Phoenix 1.2 km · 10 MW
- EdgeCore Digital 1.4 km · 19 MW
- Data center in Apache Junction 1.4 km · 41 MW
- Data center in Apache Junction 1.7 km · 77 MW
- Meta Mesa Data Center 2.0 km · 161 MW
- Data center in Apache Junction 2.0 km · 77 MW
- Comarch 2.1 km
More NTT Global Data Centers data centers
- NTT VA10 United States
- NTT Frankfurt 2 Data Center (FRA2) Germany
- NTT Japan
- NTTData Data Center United States
- NTT Hemel Hempstead 4 Data Center (HH4) United Kingdom
- NTT Berlin 1 Data Center (BER1) Germany
- NTT London 1 United Kingdom
- NTT RagingWire DC - Hillsboro United States
Sources
Correct this page or get the data
Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.