Data Center Directory

EdgeCore Digital

EdgeCore Digital is an operational data center in Apache Junction, United States. Our footprint estimate of its power is about 19 MW.

Key facts

StatusOperational
Facility power19 MW (range 7.6 MW to 47 MW)
Estimate from building footprint, low confidence. Footprint estimate: about 157,347 m² site outline x 0.12 kW per m² of land.
GPU capacity if all AIabout 8,100 GPUs
If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count.
Coordinates33.34440, -111.62258

Satellite view

Questions

How much power does EdgeCore Digital use?

We estimate the facility power at about 19 MW. Estimate from building footprint, low confidence.

Data centers near Apache Junction

Sources

Correct this page or get the data