EdgeCore Phoenix
EdgeCore Phoenix is an operational data center operated by EdgeCore Digital Infrastructure in Mesa, United States. Our footprint estimate of its power is about 10 MW.
Key facts
| Status | Operational |
|---|---|
| Operator | EdgeCore Digital Infrastructure |
| Facility power | 10 MW (range 5.1 MW to 16 MW) Estimate from building footprint, low confidence. Footprint estimate: about 8,439 m² building outline x 1 floor(s) x 1.2 kW/m². |
| GPU capacity if all AI | about 4,300 GPUs If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count. |
| Also known as | EdgeCore |
| Address | 3856 S Everton Terrace |
| Coordinates | 33.34540, -111.61989 |
| Website | edgecore.com/locations/phoenix-data-center-campus |
Power and grid
| Utility | Salt River Project (political subdivision) Electric retail service territory (HIFLD, US government). |
|---|---|
| Balancing authority | SRP |
| Nearest gas pipeline | El Paso Natural Gas Co, interstate pipeline, 12.1 km away US Energy Information Administration pipeline map. Straight-line distance. |
| Grid carbon intensity | 311 g CO₂ per kWh (Arizona, 2025) Average of all power made in the area. Ember. |
| Grid power mix | gas 43%, nuclear 25.6%, solar 17.5%, coal 7.5%, hydro 4.1%. Clean power: 49.8% |
| Industrial power price | USD 0.097 per kWh (Arizona, August 2026) Average price paid by industrial users in the state. EIA Electric Power Monthly. |
Climate and water
| Water stress today | Extremely High (>80%) (Arizona) Share of the local water supply that people already use. WRI Aqueduct 4.0, province level. |
|---|---|
| Water stress in 2050 | Extremely High (>80%) Business-as-usual scenario. |
Satellite view
Google satellite · Copernicus Sentinel-2 history · OpenStreetMap
Questions
How much power does EdgeCore Phoenix use?
We estimate the facility power at about 10 MW. Estimate from building footprint, low confidence.
How clean is the power for EdgeCore Phoenix?
The grid in Arizona emits about 311 g CO₂ per kWh (2025). Largest sources: gas 43%, nuclear 25.6%, solar 17.5%.
Who operates EdgeCore Phoenix?
EdgeCore Digital Infrastructure.
Data centers near Mesa
- EdgeCore Digital 273 m · 19 MW
- Data center in Apache Junction 584 m · 41 MW
- Data center in Apache Junction 845 m · 77 MW
- Meta Mesa Data Center 910 m · 161 MW
- NTT PH1 Datacenter 1.2 km · 33 MW
- Data center in Apache Junction 1.2 km · 77 MW
- Apple Mesa Data Center 1.4 km · 36 MW
- Comarch 1.9 km
More EdgeCore Digital Infrastructure data centers
- EdgeCore VA1 United States
- EdgeCore Silicon Valley United States
- EdgeCore Reno 1 United States
- EdgeCore VA2 United States
Sources
Correct this page or get the data
Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.