EdgeCore VA1
EdgeCore VA1 is an operational data center operated by EdgeCore Digital Infrastructure in Sterling, United States. Its power is about 94 MW.
Key facts
| Status | Operational |
|---|---|
| Operator | EdgeCore Digital Infrastructure |
| Facility power | 94 MW Derived from a tagged IT power value. IT power tag in OpenStreetMap |
| IT power | 72 MW |
| GPU capacity if all AI | about 40,000 GPUs If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count. |
| Also known as | EdgeCore AS01 |
| Address | 45865 Maries Rd |
| Coordinates | 39.02172, -77.41411 |
| Website | edgecore.com/locations/ashburn |
Power and grid
| Utility | Virginia Electric & Power Co (investor owned) Electric retail service territory (HIFLD, US government). |
|---|---|
| Balancing authority | PJM |
| Nearest gas pipeline | Columbia Gas Trans Co, interstate pipeline, 3.9 km away US Energy Information Administration pipeline map. Straight-line distance. |
| Grid carbon intensity | 357 g CO₂ per kWh (Virginia, 2025) Average of all power made in the area. Ember. |
| Grid power mix | gas 56.7%, nuclear 26.4%, solar 9.5%, coal 3.4%, bioenergy 3.3%. Clean power: 39% |
| Industrial power price | USD 0.100 per kWh (Virginia, August 2026) Average price paid by industrial users in the state. EIA Electric Power Monthly. |
Climate and water
| Average temperature | 12.8 °C NASA POWER, average of 2001 to 2025. |
|---|---|
| Highest temperature | 40.7 °C (2001 to 2025) |
| Cooling degree days | 729 per year (base 18.3 °C) More cooling degree days means more energy for cooling. |
| Solar energy | 3.98 kWh per m² per day |
| Wind at 50 m | 5.3 m/s average |
| Water stress today | Medium - High (20-40%) (Virginia) Share of the local water supply that people already use. WRI Aqueduct 4.0, province level. |
| Water stress in 2050 | Medium - High (20-40%) Business-as-usual scenario. |
Satellite view
Google satellite · Copernicus Sentinel-2 history · OpenStreetMap
Questions
How much power does EdgeCore VA1 use?
Public data puts the facility power at about 94 MW. Derived from a tagged IT power value.
How clean is the power for EdgeCore VA1?
The grid in Virginia emits about 357 g CO₂ per kWh (2025). Largest sources: gas 56.7%, nuclear 26.4%, solar 9.5%.
Who operates EdgeCore VA1?
EdgeCore Digital Infrastructure.
Data centers near Sterling
- CyrusOne NVA8 96 m · 31 MW
- Centersquare Northern Virginia (IAD1-A/F) 196 m · 16 MW
- Amazon IAD-128 264 m · 19 MW
- Centersquare Northern Virginia (IAD1-C/E) 403 m · 21 MW
- CyrusOne Sterling 457 m · 57 MW
- Amazon IAD-116 620 m · 11 MW
- Amazon IAD-174 1.4 km · 28 MW
- Amazon IAD-10 1.6 km · 12 MW
More EdgeCore Digital Infrastructure data centers
- EdgeCore Silicon Valley United States
- EdgeCore Phoenix United States
- EdgeCore Reno 1 United States
- EdgeCore VA2 United States
Sources
Correct this page or get the data
Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.