Data Center Directory

Centersquare Northern Virginia (IAD1-A/F)

Centersquare Northern Virginia (IAD1-A/F) is an operational data center operated by Centersquare in Sterling, United States. Our footprint estimate of its power is about 16 MW.

Key facts

StatusOperational
OperatorCentersquare
Facility power16 MW (range 8.1 MW to 26 MW)
Estimate from building footprint, low confidence. Footprint estimate: about 13,467 m² building outline x 1 floor(s) x 1.2 kW/m².
GPU capacity if all AIabout 6,800 GPUs
If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count.
Networks10 networks
PeeringDB.
Also known asCentersquare IAD1-A · Centersquare IAD1-B
Address45901 Nokes Blvd.
Coordinates39.02334, -77.41319
Websitecentersquaredc.com/data-centers/northern-virginia

Power and grid

Nearest high-voltage substationDTC substation, 230 kV, 2.1 km away
Straight-line distance. OpenStreetMap, substations of 100 kV and more.
HV substations within 10 km32
UtilityVirginia Electric & Power Co (investor owned)
Electric retail service territory (HIFLD, US government).
Balancing authorityPJM
Nearest gas pipelineColumbia Gas Trans Co, interstate pipeline, 4.1 km away
US Energy Information Administration pipeline map. Straight-line distance.
Power plants within 50 km1.6 GW in 48 plants
Plants with a stated output in OpenStreetMap. The largest four are listed.
Grid carbon intensity357 g CO₂ per kWh (Virginia, 2025)
Average of all power made in the area. Ember.
Grid power mixgas 56.7%, nuclear 26.4%, solar 9.5%, coal 3.4%, bioenergy 3.3%. Clean power: 39%
Industrial power priceUSD 0.100 per kWh (Virginia, August 2026)
Average price paid by industrial users in the state. EIA Electric Power Monthly.

Climate and water

Average temperature12.8 °C
NASA POWER, average of 2001 to 2025.
Highest temperature40.7 °C (2001 to 2025)
Cooling degree days729 per year (base 18.3 °C)
More cooling degree days means more energy for cooling.
Solar energy3.98 kWh per m² per day
Wind at 50 m5.3 m/s average
Water stress todayMedium - High (20-40%) (Virginia)
Share of the local water supply that people already use. WRI Aqueduct 4.0, province level.
Water stress in 2050Medium - High (20-40%)
Business-as-usual scenario.

Satellite view

Questions

How much power does Centersquare Northern Virginia (IAD1-A/F) use?

We estimate the facility power at about 16 MW. Estimate from building footprint, low confidence.

How close is Centersquare Northern Virginia (IAD1-A/F) to the power grid?

The nearest high-voltage substation in OpenStreetMap is DTC substation (230 kV), about 2.1 km away. The local utility is Virginia Electric & Power Co, in the PJM balancing area.

How clean is the power for Centersquare Northern Virginia (IAD1-A/F)?

The grid in Virginia emits about 357 g CO₂ per kWh (2025). Largest sources: gas 56.7%, nuclear 26.4%, solar 9.5%.

Who operates Centersquare Northern Virginia (IAD1-A/F)?

Centersquare.

Data centers near Sterling

More Centersquare data centers

Sources

Correct this page or get the data

Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.