CyrusOne NVA8

CyrusOne NVA8 is an operational data center operated by CyrusOne in Sterling, United States. Its power is about 31 MW.

Key facts

StatusOperational
OperatorCyrusOne
Facility power31 MW
Derived from a tagged IT power value. IT power tag in OpenStreetMap
IT power24 MW
GPU capacity if all AIabout 13,000 GPUs
If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count.
AddressMaries Road 45905, 20166, Sterling
Coordinates39.02118, -77.41324
Websitecyrusone.com/data-centers/north-america/sterling-virginia-nva8

Power and grid

Nearest high-voltage substationBeco Substation, 230 kV, 2.1 km away (Dominion Energy)
Straight-line distance. OpenStreetMap, substations of 100 kV and more.
HV substations within 10 km32
UtilityVirginia Electric & Power Co (investor owned)
Electric retail service territory (HIFLD, US government).
Balancing authorityPJM
Nearest gas pipelineColumbia Gas Trans Co, interstate pipeline, 3.8 km away
US Energy Information Administration pipeline map. Straight-line distance.
Power plants within 50 km1.6 GW in 48 plants
Plants with a stated output in OpenStreetMap. The largest four are listed.
Grid carbon intensity357 g CO₂ per kWh (Virginia, 2025)
Average of all power made in the area. Ember.
Grid power mixgas 56.7%, nuclear 26.4%, solar 9.5%, coal 3.4%, bioenergy 3.3%. Clean power: 39%
Industrial power priceUSD 0.100 per kWh (Virginia, August 2026)
Average price paid by industrial users in the state. EIA Electric Power Monthly.

Climate and water

Average temperature12.8 °C
NASA POWER, average of 2001 to 2025.
Highest temperature40.7 °C (2001 to 2025)
Cooling degree days729 per year (base 18.3 °C)
More cooling degree days means more energy for cooling.
Solar energy3.98 kWh per m² per day
Wind at 50 m5.3 m/s average
Water stress todayMedium - High (20-40%) (Virginia)
Share of the local water supply that people already use. WRI Aqueduct 4.0, province level.
Water stress in 2050Medium - High (20-40%)
Business-as-usual scenario.

Satellite view

Questions

How much power does CyrusOne NVA8 use?

Public data puts the facility power at about 31 MW. Derived from a tagged IT power value.

How close is CyrusOne NVA8 to the power grid?

The nearest high-voltage substation in OpenStreetMap is Beco Substation (230 kV), about 2.1 km away. The local utility is Virginia Electric & Power Co, in the PJM balancing area.

How clean is the power for CyrusOne NVA8?

The grid in Virginia emits about 357 g CO₂ per kWh (2025). Largest sources: gas 56.7%, nuclear 26.4%, solar 9.5%.

Who operates CyrusOne NVA8?

CyrusOne.