Data Center Directory

CyrusOne NVA14

CyrusOne NVA14 is an operational data center operated by CyrusOne in Ashburn, United States. Its power is about 47 MW.

Key facts

StatusOperational
OperatorCyrusOne
Facility power47 MW
Derived from a tagged IT power value. IT power tag in OpenStreetMap
IT power36 MW
GPU capacity if all AIabout 20,000 GPUs
If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count.
AddressBeaumeade Circle 21529, 20147, Ashburn
Coordinates39.01960, -77.45046
Websitepowerhousedata.com/data-center/powerhouse-abx-1

Power and grid

Nearest high-voltage substationInterconnection Substation, 230 kV, 100 m away (Dominion Energy)
Straight-line distance. OpenStreetMap, substations of 100 kV and more.
HV substations within 10 km49
UtilityVirginia Electric & Power Co (investor owned)
Electric retail service territory (HIFLD, US government).
Balancing authorityPJM
Nearest gas pipelineColumbia Gas Trans Co, interstate pipeline, 3.5 km away
US Energy Information Administration pipeline map. Straight-line distance.
Power plants within 50 km1.6 GW in 43 plants
Plants with a stated output in OpenStreetMap. The largest four are listed.
Grid carbon intensity357 g CO₂ per kWh (Virginia, 2025)
Average of all power made in the area. Ember.
Grid power mixgas 56.7%, nuclear 26.4%, solar 9.5%, coal 3.4%, bioenergy 3.3%. Clean power: 39%
Industrial power priceUSD 0.100 per kWh (Virginia, August 2026)
Average price paid by industrial users in the state. EIA Electric Power Monthly.

Climate and water

Average temperature12.8 °C
NASA POWER, average of 2001 to 2025.
Highest temperature40.7 °C (2001 to 2025)
Cooling degree days729 per year (base 18.3 °C)
More cooling degree days means more energy for cooling.
Solar energy3.98 kWh per m² per day
Wind at 50 m5.3 m/s average
Water stress todayMedium - High (20-40%) (Virginia)
Share of the local water supply that people already use. WRI Aqueduct 4.0, province level.
Water stress in 2050Medium - High (20-40%)
Business-as-usual scenario.

Satellite view

Questions

How much power does CyrusOne NVA14 use?

Public data puts the facility power at about 47 MW. Derived from a tagged IT power value.

How close is CyrusOne NVA14 to the power grid?

The nearest high-voltage substation in OpenStreetMap is Interconnection Substation (230 kV), about 100 m away. The local utility is Virginia Electric & Power Co, in the PJM balancing area.

How clean is the power for CyrusOne NVA14?

The grid in Virginia emits about 357 g CO₂ per kWh (2025). Largest sources: gas 56.7%, nuclear 26.4%, solar 9.5%.

Who operates CyrusOne NVA14?

CyrusOne.

Data centers near Ashburn

More CyrusOne data centers

Sources

Correct this page or get the data

Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.