H5 Data Centers Ashburn
H5 Data Centers Ashburn is an operational data center operated by H5 Data Centers in Ashburn, United States. Its power is about 55 MW.
Key facts
| Status | Operational |
|---|---|
| Operator | H5 Data Centers |
| Facility power | 55 MW Derived from a tagged IT power value. IT power tag in OpenStreetMap |
| IT power | 42 MW |
| GPU capacity if all AI | about 23,000 GPUs If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count. |
| Networks | 3 networks PeeringDB. |
| Also known as | H5 Ashburn |
| Address | 21800 Beaumeade Cir |
| Coordinates | 39.01368, -77.45171 |
| Website | h5datacenters.com/ashburn-data-center.html |
Power and grid
| Utility | Virginia Electric & Power Co (investor owned) Electric retail service territory (HIFLD, US government). |
|---|---|
| Balancing authority | PJM |
| Nearest gas pipeline | Columbia Gas Trans Co, interstate pipeline, 2.8 km away US Energy Information Administration pipeline map. Straight-line distance. |
| Grid carbon intensity | 357 g CO₂ per kWh (Virginia, 2025) Average of all power made in the area. Ember. |
| Grid power mix | gas 56.7%, nuclear 26.4%, solar 9.5%, coal 3.4%, bioenergy 3.3%. Clean power: 39% |
| Industrial power price | USD 0.100 per kWh (Virginia, August 2026) Average price paid by industrial users in the state. EIA Electric Power Monthly. |
Climate and water
| Average temperature | 12.8 °C NASA POWER, average of 2001 to 2025. |
|---|---|
| Highest temperature | 40.7 °C (2001 to 2025) |
| Cooling degree days | 729 per year (base 18.3 °C) More cooling degree days means more energy for cooling. |
| Solar energy | 3.98 kWh per m² per day |
| Wind at 50 m | 5.3 m/s average |
| Water stress today | Medium - High (20-40%) (Virginia) Share of the local water supply that people already use. WRI Aqueduct 4.0, province level. |
| Water stress in 2050 | Medium - High (20-40%) Business-as-usual scenario. |
Satellite view
Google satellite · Copernicus Sentinel-2 history · OpenStreetMap
Questions
How much power does H5 Data Centers Ashburn use?
Public data puts the facility power at about 55 MW. Derived from a tagged IT power value.
How clean is the power for H5 Data Centers Ashburn?
The grid in Virginia emits about 357 g CO₂ per kWh (2025). Largest sources: gas 56.7%, nuclear 26.4%, solar 9.5%.
Who operates H5 Data Centers Ashburn?
H5 Data Centers.
Data centers near Ashburn
- Equinix DC21 319 m · 60 MW
- Amazon IAD-169 342 m · 18 MW
- CyrusOne NVA14 667 m · 47 MW
- Equinix DC1-DC15,DC21-DC22 - Ashburn 698 m · 8 MW
- Digital Realty IAD41 782 m · 91 MW
- Cologix ASH1 799 m · 156 MW
- Equinix DC10 814 m · 27 MW
- Digital Realty IAD42 910 m · 62 MW
More H5 Data Centers data centers
- H5 Data Centers Omaha United States
- H5 Data Centers Quincy United States
- H5 Data Centers Virginia (4030) United States
- H5 Data Centers Quincy 2/3 United States
- H5 Data Centers Minneapolis United States
- H5 Data Centers Phoenix United States
- H5 Data Centers San Antonio United States
- H5 Data Centers Albuquerque United States
Sources
Correct this page or get the data
Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.