H5 Data Centers Phoenix
H5 Data Centers Phoenix is an operational data center operated by H5 Data Centers in Chandler, United States. Our footprint estimate of its power is about 6.8 MW.
Key facts
| Status | Operational |
|---|---|
| Operator | H5 Data Centers |
| Facility power | 6.8 MW (range 3.4 MW to 11 MW) Estimate from building footprint, low confidence. Footprint estimate: about 5,708 m² building outline x 1 floor(s) x 1.2 kW/m². |
| GPU capacity if all AI | about 2,900 GPUs If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count. |
| Networks | 13 networks, 1 internet exchanges PeeringDB. |
| Also known as | H5 Phoenix |
| Address | 2600 W. Germann Road |
| Coordinates | 33.27707, -111.88574 |
| Website | h5datacenters.com/phoenix-colocation.html |
Power and grid
| Nearest high-voltage substation | Henshaw Substation, 230 kV, 700 m away (Salt River Project) Straight-line distance. OpenStreetMap, substations of 100 kV and more. |
|---|---|
| HV substations within 10 km | 5 |
| Utility | City Of Mesa (municipal) Electric retail service territory (HIFLD, US government). |
| Balancing authority | WALC |
| Nearest gas pipeline | El Paso Natural Gas Co, interstate pipeline, 2.4 km away US Energy Information Administration pipeline map. Straight-line distance. |
| Power plants within 50 km | 6.2 GW in 26 plants
Plants with a stated output in OpenStreetMap. The largest four are listed. |
| Grid carbon intensity | 311 g CO₂ per kWh (Arizona, 2025) Average of all power made in the area. Ember. |
| Grid power mix | gas 43%, nuclear 25.6%, solar 17.5%, coal 7.5%, hydro 4.1%. Clean power: 49.8% |
| Industrial power price | USD 0.097 per kWh (Arizona, August 2026) Average price paid by industrial users in the state. EIA Electric Power Monthly. |
Climate and water
| Average temperature | 22.4 °C NASA POWER, average of 2001 to 2025. |
|---|---|
| Highest temperature | 48.6 °C (2001 to 2025) |
| Cooling degree days | 2,283 per year (base 18.3 °C) More cooling degree days means more energy for cooling. |
| Solar energy | 5.8 kWh per m² per day |
| Wind at 50 m | 4.4 m/s average |
| Water stress today | Extremely High (>80%) (Arizona) Share of the local water supply that people already use. WRI Aqueduct 4.0, province level. |
| Water stress in 2050 | Extremely High (>80%) Business-as-usual scenario. |
Satellite view
Google satellite · Copernicus Sentinel-2 history · OpenStreetMap
Questions
How much power does H5 Data Centers Phoenix use?
We estimate the facility power at about 6.8 MW. Estimate from building footprint, low confidence.
How close is H5 Data Centers Phoenix to the power grid?
The nearest high-voltage substation in OpenStreetMap is Henshaw Substation (230 kV), about 700 m away. The local utility is City Of Mesa, in the WALC balancing area.
How clean is the power for H5 Data Centers Phoenix?
The grid in Arizona emits about 311 g CO₂ per kWh (2025). Largest sources: gas 43%, nuclear 25.6%, solar 17.5%.
Who operates H5 Data Centers Phoenix?
H5 Data Centers.
Data centers near Chandler
- Digital Realty PHX15 (2121 S Price Rd) 272 m · 32 MW
- DataBank Phoenix (PHX3) 354 m
- CyrusOne Phoenix 783 m · 15 MW
- CyrusOne Chandler Campus 955 m · 27 MW
- CyrusOne data center in Chandler 1.2 km · 14 MW
- Emailage 5.1 km
- Digital Realty Data Center 7.6 km · 12 MW
- StrongMind 8.4 km · 1.9 MW
More H5 Data Centers data centers
- H5 Data Centers Ashburn United States
- H5 Data Centers Omaha United States
- H5 Data Centers Quincy United States
- H5 Data Centers Virginia (4030) United States
- H5 Data Centers Quincy 2/3 United States
- H5 Data Centers Minneapolis United States
- H5 Data Centers San Antonio United States
- H5 Data Centers Albuquerque United States
Sources
Correct this page or get the data
Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.