CyrusOne Phoenix
CyrusOne Phoenix is an operational data center operated by CyrusOne in Phoenix, United States. Our footprint estimate of its power is about 15 MW.
Key facts
| Status | Operational |
|---|---|
| Operator | CyrusOne |
| Facility power | 15 MW (range 7.6 MW to 24 MW) Estimate from building footprint, low confidence. Footprint estimate: about 12,724 m² building outline x 1 floor(s) x 1.2 kW/m². |
| GPU capacity if all AI | about 6,400 GPUs If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count. |
| Networks | 16 networks, 1 internet exchanges PeeringDB. |
| Address | 2335 South Ellis Road |
| Coordinates | 33.27074, -111.88206 |
| Website | cyrusone.com |
Power and grid
| Utility | City Of Mesa (municipal) Electric retail service territory (HIFLD, US government). |
|---|---|
| Balancing authority | WALC |
| Nearest gas pipeline | El Paso Natural Gas Co, interstate pipeline, 3.1 km away US Energy Information Administration pipeline map. Straight-line distance. |
| Grid carbon intensity | 311 g CO₂ per kWh (Arizona, 2025) Average of all power made in the area. Ember. |
| Grid power mix | gas 43%, nuclear 25.6%, solar 17.5%, coal 7.5%, hydro 4.1%. Clean power: 49.8% |
| Industrial power price | USD 0.097 per kWh (Arizona, August 2026) Average price paid by industrial users in the state. EIA Electric Power Monthly. |
Climate and water
| Average temperature | 22.4 °C NASA POWER, average of 2001 to 2025. |
|---|---|
| Highest temperature | 48.6 °C (2001 to 2025) |
| Cooling degree days | 2,283 per year (base 18.3 °C) More cooling degree days means more energy for cooling. |
| Solar energy | 5.8 kWh per m² per day |
| Wind at 50 m | 4.4 m/s average |
| Water stress today | Extremely High (>80%) (Arizona) Share of the local water supply that people already use. WRI Aqueduct 4.0, province level. |
| Water stress in 2050 | Extremely High (>80%) Business-as-usual scenario. |
Satellite view
Google satellite · Copernicus Sentinel-2 history · OpenStreetMap
Questions
How much power does CyrusOne Phoenix use?
We estimate the facility power at about 15 MW. Estimate from building footprint, low confidence.
How clean is the power for CyrusOne Phoenix?
The grid in Arizona emits about 311 g CO₂ per kWh (2025). Largest sources: gas 43%, nuclear 25.6%, solar 17.5%.
Who operates CyrusOne Phoenix?
CyrusOne.
Data centers near Phoenix
- CyrusOne Chandler Campus 206 m · 27 MW
- DataBank Phoenix (PHX3) 462 m
- CyrusOne data center in Chandler 502 m · 14 MW
- Digital Realty PHX15 (2121 S Price Rd) 644 m · 32 MW
- H5 Data Centers Phoenix 783 m · 6.8 MW
- Emailage 5.3 km
- Digital Realty Data Center 8.4 km · 12 MW
- All About Serving Process Server 8.7 km
More CyrusOne data centers
- CyrusOne NVA5 United States
- CyrusOne FRA3 Germany
- CyrusOne Sterling United States
- CyrusOne Aurora I United States
- CyrusOne Sterling NVA9 United States
- CyrusOne NVA14 United States
- CyrusOne Lebanon United States
- CyrusOne NC-1 United States
Sources
Correct this page or get the data
Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.