CyrusOne Lebanon
CyrusOne Lebanon is an operational data center operated by CyrusOne in Lebanon, United States. Our footprint estimate of its power is about 44 MW.
Key facts
| Status | Operational |
|---|---|
| Operator | CyrusOne |
| Facility power | 44 MW (range 18 MW to 110 MW) Estimate from building footprint, low confidence. Footprint estimate: about 365,039 m² site outline x 0.12 kW per m² of land. |
| GPU capacity if all AI | about 19,000 GPUs If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count. |
| Also known as | CyrusOne Cincinnati-Lebanon Campus |
| Address | 401 Fujitec Drive |
| Coordinates | 39.38905, -84.22080 |
| Website | cyrusone.com |
Power and grid
| Nearest high-voltage substation | Unnamed substation, 138 kV, 1.7 km away Straight-line distance. OpenStreetMap, substations of 100 kV and more. |
|---|---|
| Nearest 220 kV+ substation | Unnamed substation, 345 kV, 9.6 km away |
| HV substations within 10 km | 8 |
| Utility | Duke Energy Ohio INC (investor owned) Electric retail service territory (HIFLD, US government). |
| Balancing authority | PJM |
| Nearest gas pipeline | Texas Gas Transmission Co, interstate pipeline, 13 km away US Energy Information Administration pipeline map. Straight-line distance. |
| Power plants within 50 km | 3.1 GW in 17 plants
Plants with a stated output in OpenStreetMap. The largest four are listed. |
| Grid carbon intensity | 536 g CO₂ per kWh (Ohio, 2025) Average of all power made in the area. Ember. |
| Grid power mix | gas 54.9%, coal 24.4%, nuclear 11.7%, solar 5.8%, wind 2%. Clean power: 20% |
| Industrial power price | USD 0.098 per kWh (Ohio, August 2026) Average price paid by industrial users in the state. EIA Electric Power Monthly. |
Climate and water
| Average temperature | 11.4 °C NASA POWER, average of 2001 to 2025. |
|---|---|
| Highest temperature | 37.7 °C (2001 to 2025) |
| Cooling degree days | 530 per year (base 18.3 °C) More cooling degree days means more energy for cooling. |
| Solar energy | 3.99 kWh per m² per day |
| Wind at 50 m | 6.2 m/s average |
| Water stress today | Low - Medium (10-20%) (Ohio) Share of the local water supply that people already use. WRI Aqueduct 4.0, province level. |
| Water stress in 2050 | Low - Medium (10-20%) Business-as-usual scenario. |
Satellite view
Google satellite · Copernicus Sentinel-2 history · OpenStreetMap
Questions
How much power does CyrusOne Lebanon use?
We estimate the facility power at about 44 MW. Estimate from building footprint, low confidence.
How close is CyrusOne Lebanon to the power grid?
The nearest high-voltage substation in OpenStreetMap is an unnamed substation (138 kV), about 1.7 km away. The local utility is Duke Energy Ohio INC, in the PJM balancing area.
How clean is the power for CyrusOne Lebanon?
The grid in Ohio emits about 536 g CO₂ per kWh (2025). Largest sources: gas 54.9%, coal 24.4%, nuclear 11.7%.
Who operates CyrusOne Lebanon?
CyrusOne.
Data centers near Lebanon
- CyrusOne Mason 12.3 km · 11 MW
- Encore Technologies BLU1 17.8 km
- Data center in Sharonville 19.6 km · 4.2 MW
- Flexential - Cincinnati (CIN1/2) 21.3 km
- Iron Mountain Data Center - Ohio (OHS-1) 22.5 km
- Encore Technologies MSB1 25.3 km
- CyrusOne Hamilton 29.8 km · 16 MW
- Encore Technologies NOR1 32.1 km
More CyrusOne data centers
- CyrusOne NVA5 United States
- CyrusOne FRA3 Germany
- CyrusOne Sterling United States
- CyrusOne Aurora I United States
- CyrusOne Sterling NVA9 United States
- CyrusOne NVA14 United States
- CyrusOne NC-1 United States
- CyrusOne NJ-1 United States
Sources
Correct this page or get the data
Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.