Iron Mountain Data Center - Ohio (OHS-1)
Iron Mountain Data Center - Ohio (OHS-1) is an operational data center operated by Iron Mountain in Miamisburg, United States. No power figure is public for this site yet.
Key facts
| Status | Operational |
|---|---|
| Operator | Iron Mountain |
| Networks | 2 networks PeeringDB. |
| Address | 3366 S Tech Blvd |
| Coordinates | 39.59109, -84.23638 |
| Website | ironmountain.com/digital-transformation/data-centers/locations/ohio-data-center |
Power and grid
| Nearest high-voltage substation | Unnamed substation, 138 kV, 700 m away Straight-line distance. OpenStreetMap, substations of 100 kV and more. |
|---|---|
| Nearest 220 kV+ substation | Sugar Creek Substation, 345 kV, 12.1 km away |
| HV substations within 10 km | 6 |
| Utility | Dayton Power & Light Co (investor owned) Electric retail service territory (HIFLD, US government). |
| Balancing authority | PJM |
| Nearest gas pipeline | Rockies Express Pipeline, interstate pipeline, 1.1 km away US Energy Information Administration pipeline map. Straight-line distance. |
| Power plants within 50 km | 2.9 GW in 15 plants
Plants with a stated output in OpenStreetMap. The largest four are listed. |
| Grid carbon intensity | 536 g CO₂ per kWh (Ohio, 2025) Average of all power made in the area. Ember. |
| Grid power mix | gas 54.9%, coal 24.4%, nuclear 11.7%, solar 5.8%, wind 2%. Clean power: 20% |
| Industrial power price | USD 0.098 per kWh (Ohio, August 2026) Average price paid by industrial users in the state. EIA Electric Power Monthly. |
Climate and water
| Average temperature | 11.4 °C NASA POWER, average of 2001 to 2025. |
|---|---|
| Highest temperature | 37.7 °C (2001 to 2025) |
| Cooling degree days | 530 per year (base 18.3 °C) More cooling degree days means more energy for cooling. |
| Solar energy | 3.99 kWh per m² per day |
| Wind at 50 m | 6.2 m/s average |
| Water stress today | Low - Medium (10-20%) (Ohio) Share of the local water supply that people already use. WRI Aqueduct 4.0, province level. |
| Water stress in 2050 | Low - Medium (10-20%) Business-as-usual scenario. |
Satellite view
Google satellite · Copernicus Sentinel-2 history · OpenStreetMap
Questions
How close is Iron Mountain Data Center - Ohio (OHS-1) to the power grid?
The nearest high-voltage substation in OpenStreetMap is an unnamed substation (138 kV), about 700 m away. The local utility is Dayton Power & Light Co, in the PJM balancing area.
How clean is the power for Iron Mountain Data Center - Ohio (OHS-1)?
The grid in Ohio emits about 536 g CO₂ per kWh (2025). Largest sources: gas 54.9%, coal 24.4%, nuclear 11.7%.
Who operates Iron Mountain Data Center - Ohio (OHS-1)?
Iron Mountain.
Data centers near Miamisburg
- Encore Technologies MSB1 2.9 km
- CyrusOne Lebanon 22.5 km · 44 MW
- CyrusOne Mason 32.6 km · 11 MW
- Flexential - Cincinnati (CIN1/2) 35.6 km
- Data center in Sharonville 36.3 km · 4.2 MW
- CyrusOne Hamilton 36.4 km · 16 MW
- Encore Technologies BLU1 36.7 km
- Encore Technologies NOR1 51.2 km
More Iron Mountain data centers
- Iron Mountain Data Center - New Jersey (NJE-1) United States
- Iron Mountain data center in Sandston United States
- Iron Mountain Data Center - Manassas (VA-1) United States
- Iron Mountain FRA-1 Germany
- Iron Mountain VA-3 United States
- Iron Mountain Data Center - Manassas (VA-2) United States
- Iron Mountain VA-7 United States
- Iron Mountain Data Center - London (LON-1) United Kingdom
Sources
Correct this page or get the data
Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.