Data center in Sharonville is an operational data center in Sharonville, United States. Our footprint estimate of its power is about 4.2 MW.

Key facts

StatusOperational
Facility power4.2 MW (range 2.1 MW to 6.7 MW)
Estimate from building footprint, low confidence. Footprint estimate: about 1,752 m² building outline x 2 floor(s) x 1.2 kW/m².
GPU capacity if all AIabout 1,800 GPUs
If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count.
Coordinates39.29405, -84.41211

Power and grid

Nearest high-voltage substationDimmick Substation, 138 kV, 2.6 km away (Duke Energy)
Straight-line distance. OpenStreetMap, substations of 100 kV and more.
Nearest 220 kV+ substationPort Union Substation, 345 kV, 4.9 km away
HV substations within 10 km8
UtilityDuke Energy Ohio INC (investor owned)
Electric retail service territory (HIFLD, US government).
Balancing authorityPJM
Nearest gas pipelineTexas Gas Transmission Co, interstate pipeline, 12 km away
US Energy Information Administration pipeline map. Straight-line distance.
Power plants within 50 km4.8 GW in 18 plants
Plants with a stated output in OpenStreetMap. The largest four are listed.
Grid carbon intensity536 g CO₂ per kWh (Ohio, 2025)
Average of all power made in the area. Ember.
Grid power mixgas 54.9%, coal 24.4%, nuclear 11.7%, solar 5.8%, wind 2%. Clean power: 20%
Industrial power priceUSD 0.098 per kWh (Ohio, August 2026)
Average price paid by industrial users in the state. EIA Electric Power Monthly.

Climate and water

Average temperature11.6 °C
NASA POWER, average of 2001 to 2025.
Highest temperature38.9 °C (2001 to 2025)
Cooling degree days573 per year (base 18.3 °C)
More cooling degree days means more energy for cooling.
Solar energy3.99 kWh per m² per day
Wind at 50 m6.1 m/s average
Water stress todayLow - Medium (10-20%) (Ohio)
Share of the local water supply that people already use. WRI Aqueduct 4.0, province level.
Water stress in 2050Low - Medium (10-20%)
Business-as-usual scenario.

Satellite view

Questions

How much power does Data center in Sharonville use?

We estimate the facility power at about 4.2 MW. Estimate from building footprint, low confidence.

How close is Data center in Sharonville to the power grid?

The nearest high-voltage substation in OpenStreetMap is Dimmick Substation (138 kV), about 2.6 km away. The local utility is Duke Energy Ohio INC, in the PJM balancing area.

How clean is the power for Data center in Sharonville?

The grid in Ohio emits about 536 g CO₂ per kWh (2025). Largest sources: gas 54.9%, coal 24.4%, nuclear 11.7%.