Encore Technologies NOR1
Encore Technologies NOR1 is an operational data center operated by Encore Technologies in Norwood, United States. No power figure is public for this site yet.
Key facts
| Status | Operational |
|---|---|
| Operator | Encore Technologies |
| Address | 4620 Wesley Ave |
| Coordinates | 39.16054, -84.44869 |
| Website | encore.tech |
Power and grid
| Nearest high-voltage substation | Unnamed substation, 138 kV, 2.3 km away (Duke Energy) Straight-line distance. OpenStreetMap, substations of 100 kV and more. |
|---|---|
| Nearest 220 kV+ substation | Unnamed substation, 345 kV, 3.8 km away |
| HV substations within 10 km | 12 |
| Utility | Duke Energy Ohio INC (investor owned) Electric retail service territory (HIFLD, US government). |
| Balancing authority | PJM |
| Nearest gas pipeline | Union Light Heat & Power, interstate pipeline, 6.7 km away US Energy Information Administration pipeline map. Straight-line distance. |
| Power plants within 50 km | 5.6 GW in 23 plants
Plants with a stated output in OpenStreetMap. The largest four are listed. |
| Grid carbon intensity | 536 g CO₂ per kWh (Ohio, 2025) Average of all power made in the area. Ember. |
| Grid power mix | gas 54.9%, coal 24.4%, nuclear 11.7%, solar 5.8%, wind 2%. Clean power: 20% |
| Industrial power price | USD 0.098 per kWh (Ohio, August 2026) Average price paid by industrial users in the state. EIA Electric Power Monthly. |
Climate and water
| Average temperature | 12.3 °C NASA POWER, average of 2001 to 2025. |
|---|---|
| Highest temperature | 41 °C (2001 to 2025) |
| Cooling degree days | 674 per year (base 18.3 °C) More cooling degree days means more energy for cooling. |
| Solar energy | 3.99 kWh per m² per day |
| Wind at 50 m | 4.6 m/s average |
| Water stress today | Low - Medium (10-20%) (Ohio) Share of the local water supply that people already use. WRI Aqueduct 4.0, province level. |
| Water stress in 2050 | Low - Medium (10-20%) Business-as-usual scenario. |
Satellite view
Google satellite · Copernicus Sentinel-2 history · OpenStreetMap
Questions
How close is Encore Technologies NOR1 to the power grid?
The nearest high-voltage substation in OpenStreetMap is an unnamed substation (138 kV), about 2.3 km away. The local utility is Duke Energy Ohio INC, in the PJM balancing area.
How clean is the power for Encore Technologies NOR1?
The grid in Ohio emits about 536 g CO₂ per kWh (2025). Largest sources: gas 54.9%, coal 24.4%, nuclear 11.7%.
Who operates Encore Technologies NOR1?
Encore Technologies.
Data centers near Norwood
- Level(3) Cincinnati 8.0 km
- Cincinnatti Bell - West 7th Street 8.7 km · 20 MW
- DartPoints Cincinnati, OH - CVG1 9.1 km
- H5 Data Centers Cincinnati 9.5 km
- T5@Cincinnati 9.7 km
- Encore Technologies BLU1 14.7 km
- Data center in Sharonville 15.2 km · 4.2 MW
- Flexential - Cincinnati (CIN1/2) 17.3 km
More Encore Technologies data centers
- Encore Technologies BLU1 United States
- Encore Technologies MSB1 United States