Iron Mountain Data Center - New Jersey (NJE-1)
Iron Mountain Data Center - New Jersey (NJE-1) is an operational data center operated by Iron Mountain in Edison, United States. Our footprint estimate of its power is about 138 MW.
Key facts
| Status | Operational |
|---|---|
| Operator | Iron Mountain |
| Facility power | 138 MW (range 69 MW to 221 MW) Estimate from building footprint, low confidence. Footprint estimate: about 115,214 m² building outline x 1 floor(s) x 1.2 kW/m². |
| GPU capacity if all AI | about 59,000 GPUs If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count. |
| Networks | 22 networks, 2 internet exchanges PeeringDB. |
| Also known as | IO Datacenter |
| Address | 3003 Woodbridge Ave |
| Coordinates | 40.52108, -74.34738 |
| Website | ironmountain.com/digital-transformation/data-centers/locations/new-jersey-data-center |
Power and grid
| Nearest high-voltage substation | Metuchen/Pierson Ave, 230 kV, 1.1 km away (Public Service Enterprise Group) Straight-line distance. OpenStreetMap, substations of 100 kV and more. |
|---|---|
| HV substations within 10 km | 22 |
| Utility | Public Service Elec & Gas Co (investor owned) Electric retail service territory (HIFLD, US government). |
| Balancing authority | PJM |
| Nearest gas pipeline | Transcontinental Gas PL, interstate pipeline, 800 m away US Energy Information Administration pipeline map. Straight-line distance. |
| Power plants within 50 km | 18 GW in 189 plants
Plants with a stated output in OpenStreetMap. The largest four are listed. |
| Grid carbon intensity | 265 g CO₂ per kWh (New Jersey, 2025) Average of all power made in the area. Ember. |
| Grid power mix | gas 45.8%, nuclear 43.2%, solar 9%, oil and other fossil 1.5%, bioenergy 0.9%. Clean power: 52.8% |
| Industrial power price | USD 0.162 per kWh (New Jersey, August 2026) Average price paid by industrial users in the state. EIA Electric Power Monthly. |
Climate and water
| Average temperature | 11.7 °C NASA POWER, average of 2001 to 2025. |
|---|---|
| Highest temperature | 38.7 °C (2001 to 2025) |
| Cooling degree days | 565 per year (base 18.3 °C) More cooling degree days means more energy for cooling. |
| Solar energy | 3.92 kWh per m² per day |
| Wind at 50 m | 5.2 m/s average |
| Water stress today | Medium - High (20-40%) (New Jersey) Share of the local water supply that people already use. WRI Aqueduct 4.0, province level. |
| Water stress in 2050 | Medium - High (20-40%) Business-as-usual scenario. |
Satellite view
Google satellite · Copernicus Sentinel-2 history · OpenStreetMap
Questions
How much power does Iron Mountain Data Center - New Jersey (NJE-1) use?
We estimate the facility power at about 138 MW. Estimate from building footprint, low confidence.
How close is Iron Mountain Data Center - New Jersey (NJE-1) to the power grid?
The nearest high-voltage substation in OpenStreetMap is Metuchen/Pierson Ave (230 kV), about 1.1 km away. The local utility is Public Service Elec & Gas Co, in the PJM balancing area.
How clean is the power for Iron Mountain Data Center - New Jersey (NJE-1)?
The grid in New Jersey emits about 265 g CO₂ per kWh (2025). Largest sources: gas 45.8%, nuclear 43.2%, solar 9%.
Who operates Iron Mountain Data Center - New Jersey (NJE-1)?
Iron Mountain.
Data centers near Edison
- Open Data Centers Piscataway 9.8 km
- DataBank Piscataway (EWR2) 9.9 km · 7.8 MW
- Data center in Middlesex 9.9 km · 12 MW
- Barclays Datacenter 9.9 km · 60 MW
- Centersquare New Jersey (EWR3) 10.0 km
- Digital Realty New York EWR12 10.1 km · 43 MW
- Data center in Carteret 11.3 km · 23 MW
- QTS Piscataway Data Center 12.2 km · 96 MW
More Iron Mountain data centers
- Iron Mountain data center in Sandston United States
- Iron Mountain Data Center - Manassas (VA-1) United States
- Iron Mountain FRA-1 Germany
- Iron Mountain VA-3 United States
- Iron Mountain Data Center - Manassas (VA-2) United States
- Iron Mountain VA-7 United States
- Iron Mountain Data Center - London (LON-1) United Kingdom
- Iron Mountain Australia
Sources
Correct this page or get the data
Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.