Open Data Centers Piscataway
Open Data Centers Piscataway is an operational data center in Middlesex, United States. No power figure is public for this site yet.
Key facts
| Status | Operational |
|---|---|
| Coordinates | 40.55035, -74.45686 |
Power and grid
| Utility | Public Service Elec & Gas Co (investor owned) Electric retail service territory (HIFLD, US government). |
|---|---|
| Balancing authority | PJM |
| Nearest gas pipeline | Texas Eastern Trans Co, interstate pipeline, 2.8 km away US Energy Information Administration pipeline map. Straight-line distance. |
| Grid carbon intensity | 265 g CO₂ per kWh (New Jersey, 2025) Average of all power made in the area. Ember. |
| Grid power mix | gas 45.8%, nuclear 43.2%, solar 9%, oil and other fossil 1.5%, bioenergy 0.9%. Clean power: 52.8% |
| Industrial power price | USD 0.162 per kWh (New Jersey, August 2026) Average price paid by industrial users in the state. EIA Electric Power Monthly. |
Climate and water
| Average temperature | 11.7 °C NASA POWER, average of 2001 to 2025. |
|---|---|
| Highest temperature | 38.7 °C (2001 to 2025) |
| Cooling degree days | 565 per year (base 18.3 °C) More cooling degree days means more energy for cooling. |
| Solar energy | 3.92 kWh per m² per day |
| Wind at 50 m | 5.2 m/s average |
| Water stress today | Medium - High (20-40%) (New Jersey) Share of the local water supply that people already use. WRI Aqueduct 4.0, province level. |
| Water stress in 2050 | Medium - High (20-40%) Business-as-usual scenario. |
Satellite view
Google satellite · Copernicus Sentinel-2 history · OpenStreetMap
Questions
How clean is the power for Open Data Centers Piscataway?
The grid in New Jersey emits about 265 g CO₂ per kWh (2025). Largest sources: gas 45.8%, nuclear 43.2%, solar 9%.
Data centers near Middlesex
- DataBank Piscataway (EWR2) 170 m · 7.8 MW
- Data center in Middlesex 277 m · 12 MW
- Digital Realty New York EWR12 349 m · 43 MW
- Barclays Datacenter 423 m · 60 MW
- Centersquare New Jersey (EWR3) 466 m
- QTS Piscataway Data Center 2.4 km · 96 MW
- Anexio NJ1 2.5 km
- QTS Piscataway (PNJ1) 2.5 km
Sources
Correct this page or get the data
Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.