QTS Piscataway (PNJ1)
QTS Piscataway (PNJ1) is an operational data center operated by QTS Realty Trust in Piscataway, United States. No power figure is public for this site yet.
Key facts
| Status | Operational |
|---|---|
| Operator | QTS Realty Trust |
| Networks | 34 networks, 3 internet exchanges PeeringDB. |
| Address | 101 Possumtown Road |
| Coordinates | 40.55691, -74.48474 |
| Website | qtsdatacenters.com/data-centers/piscataway |
Power and grid
| Nearest high-voltage substation | Middlesex Switch Tap, 230 kV, 2 km away (Public Service Enterprise Group) Straight-line distance. OpenStreetMap, substations of 100 kV and more. |
|---|---|
| HV substations within 10 km | 6 |
| Utility | Public Service Elec & Gas Co (investor owned) Electric retail service territory (HIFLD, US government). |
| Balancing authority | PJM |
| Nearest gas pipeline | Texas Eastern Trans Co, interstate pipeline, 1.4 km away US Energy Information Administration pipeline map. Straight-line distance. |
| Power plants within 50 km | 13 GW in 187 plants
Plants with a stated output in OpenStreetMap. The largest four are listed. |
| Grid carbon intensity | 265 g CO₂ per kWh (New Jersey, 2025) Average of all power made in the area. Ember. |
| Grid power mix | gas 45.8%, nuclear 43.2%, solar 9%, oil and other fossil 1.5%, bioenergy 0.9%. Clean power: 52.8% |
| Industrial power price | USD 0.162 per kWh (New Jersey, August 2026) Average price paid by industrial users in the state. EIA Electric Power Monthly. |
Climate and water
| Average temperature | 11.7 °C NASA POWER, average of 2001 to 2025. |
|---|---|
| Highest temperature | 38.7 °C (2001 to 2025) |
| Cooling degree days | 565 per year (base 18.3 °C) More cooling degree days means more energy for cooling. |
| Solar energy | 3.92 kWh per m² per day |
| Wind at 50 m | 5.2 m/s average |
| Water stress today | Medium - High (20-40%) (New Jersey) Share of the local water supply that people already use. WRI Aqueduct 4.0, province level. |
| Water stress in 2050 | Medium - High (20-40%) Business-as-usual scenario. |
Satellite view
Google satellite · Copernicus Sentinel-2 history · OpenStreetMap
Questions
How close is QTS Piscataway (PNJ1) to the power grid?
The nearest high-voltage substation in OpenStreetMap is Middlesex Switch Tap (230 kV), about 2 km away. The local utility is Public Service Elec & Gas Co, in the PJM balancing area.
How clean is the power for QTS Piscataway (PNJ1)?
The grid in New Jersey emits about 265 g CO₂ per kWh (2025). Largest sources: gas 45.8%, nuclear 43.2%, solar 9%.
Who operates QTS Piscataway (PNJ1)?
QTS Realty Trust.
Data centers near Piscataway
- Anexio NJ1 55 m
- QTS Piscataway Data Center 69 m · 96 MW
- Optimum 1.3 km · 11 MW
- Equinix 1.6 km · 10 MW
- Digital Fortress (PNJ) 1.7 km · 18 MW
- Digital Realty New York EWR12 2.2 km · 43 MW
- Centersquare New Jersey (EWR3) 2.4 km
- Barclays Datacenter 2.4 km · 60 MW
More QTS Realty Trust data centers
- QTS Atlanta-Metro (ATL1) United States
- QTS Atlanta-Suwanee (SUW1) United States
- QTS Irving - Dallas (DFW1) United States
- QTS Chicago (CHI1) United States
- QTS Atlanta-Fayetteville (ATL2) United States
- QTS Eemshaven (EEM1) Netherlands
- QTS Sacramento (SAC1) United States
- QTS Ashburn (ASH1) United States
Sources
Correct this page or get the data
Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.