Digital Fortress (PNJ)
Digital Fortress (PNJ) is an operational data center operated by Digital Fortress in Piscataway, United States. Our footprint estimate of its power is about 18 MW.
Key facts
| Status | Operational |
|---|---|
| Operator | Digital Fortress |
| Facility power | 18 MW (range 9.1 MW to 29 MW) Estimate from building footprint, low confidence. Footprint estimate: about 15,110 m² building outline x 1 floor(s) x 1.2 kW/m². |
| GPU capacity if all AI | about 7,700 GPUs If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count. |
| Networks | 3 networks PeeringDB. |
| Also known as | Chirisa Technology Parks - Piscataway |
| Address | 201 Centennial Ave Bldg B |
| Coordinates | 40.54414, -74.49659 |
| Website | digital-fortress.com |
Power and grid
| Nearest high-voltage substation | Middlesex Switch Tap, 230 kV, 3.4 km away (Public Service Enterprise Group) Straight-line distance. OpenStreetMap, substations of 100 kV and more. |
|---|---|
| HV substations within 10 km | 7 |
| Utility | Public Service Elec & Gas Co (investor owned) Electric retail service territory (HIFLD, US government). |
| Balancing authority | PJM |
| Nearest gas pipeline | Texas Eastern Trans Co, interstate pipeline, 2 km away US Energy Information Administration pipeline map. Straight-line distance. |
| Power plants within 50 km | 13 GW in 187 plants
Plants with a stated output in OpenStreetMap. The largest four are listed. |
| Grid carbon intensity | 265 g CO₂ per kWh (New Jersey, 2025) Average of all power made in the area. Ember. |
| Grid power mix | gas 45.8%, nuclear 43.2%, solar 9%, oil and other fossil 1.5%, bioenergy 0.9%. Clean power: 52.8% |
| Industrial power price | USD 0.162 per kWh (New Jersey, August 2026) Average price paid by industrial users in the state. EIA Electric Power Monthly. |
Climate and water
| Average temperature | 11.7 °C NASA POWER, average of 2001 to 2025. |
|---|---|
| Highest temperature | 38.7 °C (2001 to 2025) |
| Cooling degree days | 565 per year (base 18.3 °C) More cooling degree days means more energy for cooling. |
| Solar energy | 3.92 kWh per m² per day |
| Wind at 50 m | 5.2 m/s average |
| Water stress today | Medium - High (20-40%) (New Jersey) Share of the local water supply that people already use. WRI Aqueduct 4.0, province level. |
| Water stress in 2050 | Medium - High (20-40%) Business-as-usual scenario. |
Satellite view
Google satellite · Copernicus Sentinel-2 history · OpenStreetMap
Questions
How much power does Digital Fortress (PNJ) use?
We estimate the facility power at about 18 MW. Estimate from building footprint, low confidence.
How close is Digital Fortress (PNJ) to the power grid?
The nearest high-voltage substation in OpenStreetMap is Middlesex Switch Tap (230 kV), about 3.4 km away. The local utility is Public Service Elec & Gas Co, in the PJM balancing area.
How clean is the power for Digital Fortress (PNJ)?
The grid in New Jersey emits about 265 g CO₂ per kWh (2025). Largest sources: gas 45.8%, nuclear 43.2%, solar 9%.
Who operates Digital Fortress (PNJ)?
Digital Fortress.
Data centers near Piscataway
- Equinix 135 m · 10 MW
- Optimum 491 m · 11 MW
- QTS Piscataway (PNJ1) 1.7 km
- QTS Piscataway Data Center 1.8 km · 96 MW
- Anexio NJ1 1.8 km
- Barclays Datacenter 3.1 km · 60 MW
- DataBank Piscataway (EWR2) 3.3 km · 7.8 MW
- Digital Realty New York EWR12 3.3 km · 43 MW
More Digital Fortress data centers
- Digital Fortress: Richmond United States
- Digital Fortress (SEA) United States
- Digital Fortress (LYN) United States
- Digital Fortress (PTL) United States
- Digital Fortress (PTL2) United States
Sources
Correct this page or get the data
Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.