Optimum
Optimum is an operational data center in Middlesex, United States. Our footprint estimate of its power is about 11 MW.
Key facts
| Status | Operational |
|---|---|
| Facility power | 11 MW (range 5.4 MW to 17 MW) Estimate from building footprint, low confidence. Footprint estimate: about 9,039 m² building outline x 1 floor(s) x 1.2 kW/m². |
| GPU capacity if all AI | about 4,700 GPUs If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count. |
| Coordinates | 40.54682, -74.49198 |
Satellite view
Google satellite · Copernicus Sentinel-2 history · OpenStreetMap
Questions
How much power does Optimum use?
We estimate the facility power at about 11 MW. Estimate from building footprint, low confidence.
Data centers near Middlesex
- Equinix 356 m · 10 MW
- Digital Fortress (PNJ) 491 m · 18 MW
- QTS Piscataway (PNJ1) 1.3 km
- QTS Piscataway Data Center 1.3 km · 96 MW
- Anexio NJ1 1.3 km
- Barclays Datacenter 2.7 km · 60 MW
- Digital Realty New York EWR12 2.9 km · 43 MW
- DataBank Piscataway (EWR2) 2.9 km · 7.8 MW
Sources
Correct this page or get the data
Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.