Digital Fortress (PTL)
Digital Fortress (PTL) is an operational data center operated by Digital Fortress in Portland, United States. No power figure is public for this site yet.
Key facts
| Status | Operational |
|---|---|
| Operator | Digital Fortress |
| Networks | 5 networks PeeringDB. |
| Also known as | Digital Fortress - Portland 1 |
| Address | 511 SW 10th ave. |
| Coordinates | 45.52122, -122.68182 |
| Website | digital-fortress.com |
Power and grid
| Nearest high-voltage substation | Canyon Substation, 115 kV, 900 m away (Portland General Electric) Straight-line distance. OpenStreetMap, substations of 100 kV and more. |
|---|---|
| Nearest 220 kV+ substation | Saint Johns Substation, 230 kV, 12.2 km away |
| HV substations within 10 km | 30 |
| Utility | Portland General Electric Co (investor owned) Electric retail service territory (HIFLD, US government). |
| Balancing authority | PGE |
| Nearest gas pipeline | Northwest Pipeline, interstate pipeline, 12.5 km away US Energy Information Administration pipeline map. Straight-line distance. |
| Power plants within 50 km | 1.1 GW in 58 plants
Plants with a stated output in OpenStreetMap. The largest four are listed. |
| Grid carbon intensity | 200 g CO₂ per kWh (Oregon, 2025) Average of all power made in the area. Ember. |
| Grid power mix | hydro 44.6%, gas 33.9%, wind 14.5%, solar 5.2%, bioenergy 1.6%. Clean power: 66.2% |
| Industrial power price | USD 0.087 per kWh (Oregon, August 2026) Average price paid by industrial users in the state. EIA Electric Power Monthly. |
Climate and water
| Average temperature | 10.4 °C NASA POWER, average of 2001 to 2025. |
|---|---|
| Highest temperature | 40.6 °C (2001 to 2025) |
| Cooling degree days | 179 per year (base 18.3 °C) More cooling degree days means more energy for cooling. |
| Solar energy | 3.67 kWh per m² per day |
| Wind at 50 m | 4 m/s average |
| Water stress today | Low - Medium (10-20%) (Oregon) Share of the local water supply that people already use. WRI Aqueduct 4.0, province level. |
| Water stress in 2050 | Low - Medium (10-20%) Business-as-usual scenario. |
Satellite view
Google satellite · Copernicus Sentinel-2 history · OpenStreetMap
Questions
How close is Digital Fortress (PTL) to the power grid?
The nearest high-voltage substation in OpenStreetMap is Canyon Substation (115 kV), about 900 m away. The local utility is Portland General Electric Co, in the PGE balancing area.
How clean is the power for Digital Fortress (PTL)?
The grid in Oregon emits about 200 g CO₂ per kWh (2025). Largest sources: hydro 44.6%, gas 33.9%, wind 14.5%.
Who operates Digital Fortress (PTL)?
Digital Fortress.
Data centers near Portland
- PTOR1 82 m · 12 MW
- Corepacket PDX-1 207 m
- Opus Interactive Portland (PDX01) 249 m
- LightPoint Corporation 308 m
- Lumen Portland 1.2 km
- H5 Data Centers Portland (OR01) 1.2 km
- Digital Fortress (PTL2) 8.9 km
- BVTNORXB - Beaverton Central Office 10.7 km
More Digital Fortress data centers
- Digital Fortress: Richmond United States
- Digital Fortress (PNJ) United States
- Digital Fortress (SEA) United States
- Digital Fortress (LYN) United States
- Digital Fortress (PTL2) United States
Sources
Correct this page or get the data
Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.