PTOR1
PTOR1 is an operational data center operated by 1547 Critical Systems Realty in Portland, United States. Our footprint estimate of its power is about 12 MW.
Key facts
| Status | Operational |
|---|---|
| Operator | 1547 Critical Systems Realty |
| Facility power | 12 MW (range 5.8 MW to 19 MW) Estimate from building footprint, low confidence. Footprint estimate: about 4,826 m² building outline x 2 floor(s) x 1.2 kW/m². |
| GPU capacity if all AI | about 5,100 GPUs If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count. |
| Networks | 70 networks, 2 internet exchanges PeeringDB. |
| Also known as | Pittock Block · The Pittock Internet Exchange |
| Address | 921 SW Washington St |
| Coordinates | 45.52137, -122.68079 |
| Website | 1547realty.com |
Power and grid
| Utility | Portland General Electric Co (investor owned) Electric retail service territory (HIFLD, US government). |
|---|---|
| Balancing authority | PGE |
| Nearest gas pipeline | Northwest Pipeline, interstate pipeline, 12.5 km away US Energy Information Administration pipeline map. Straight-line distance. |
| Grid carbon intensity | 200 g CO₂ per kWh (Oregon, 2025) Average of all power made in the area. Ember. |
| Grid power mix | hydro 44.6%, gas 33.9%, wind 14.5%, solar 5.2%, bioenergy 1.6%. Clean power: 66.2% |
| Industrial power price | USD 0.087 per kWh (Oregon, August 2026) Average price paid by industrial users in the state. EIA Electric Power Monthly. |
Climate and water
| Average temperature | 10.4 °C NASA POWER, average of 2001 to 2025. |
|---|---|
| Highest temperature | 40.6 °C (2001 to 2025) |
| Cooling degree days | 179 per year (base 18.3 °C) More cooling degree days means more energy for cooling. |
| Solar energy | 3.67 kWh per m² per day |
| Wind at 50 m | 4 m/s average |
| Water stress today | Low - Medium (10-20%) (Oregon) Share of the local water supply that people already use. WRI Aqueduct 4.0, province level. |
| Water stress in 2050 | Low - Medium (10-20%) Business-as-usual scenario. |
Satellite view
Google satellite · Copernicus Sentinel-2 history · OpenStreetMap
Questions
How much power does PTOR1 use?
We estimate the facility power at about 12 MW. Estimate from building footprint, low confidence.
How clean is the power for PTOR1?
The grid in Oregon emits about 200 g CO₂ per kWh (2025). Largest sources: hydro 44.6%, gas 33.9%, wind 14.5%.
Who operates PTOR1?
1547 Critical Systems Realty.
Data centers near Portland
- Digital Fortress (PTL) 82 m
- Corepacket PDX-1 130 m
- LightPoint Corporation 227 m
- Opus Interactive Portland (PDX01) 292 m
- Lumen Portland 1.2 km
- H5 Data Centers Portland (OR01) 1.2 km
- Digital Fortress (PTL2) 9.0 km
- BVTNORXB - Beaverton Central Office 10.8 km