QTS Atlanta-Suwanee (SUW1)
QTS Atlanta-Suwanee (SUW1) is an operational data center operated by QTS Realty Trust in Suwanee, United States. Our footprint estimate of its power is about 67 MW.
Key facts
| Status | Operational |
|---|---|
| Operator | QTS Realty Trust |
| Facility power | 67 MW (range 33 MW to 107 MW) Estimate from building footprint, low confidence. Footprint estimate: about 55,588 m² building outline x 1 floor(s) x 1.2 kW/m². |
| GPU capacity if all AI | about 29,000 GPUs If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count. |
| Networks | 11 networks, 2 internet exchanges PeeringDB. |
| Also known as | QTS Suwanee Data Center 1 |
| Address | 300 Satellite Blvd NW |
| Coordinates | 34.03543, -84.06101 |
| Website | qtsdatacenters.com/data-centers/atlanta-suwanee |
Power and grid
| Nearest high-voltage substation | Avonlea Substation, 230 kV, 1.2 km away (Georgia Power) Straight-line distance. OpenStreetMap, substations of 100 kV and more. |
|---|---|
| HV substations within 10 km | 22 |
| Utility | Georgia Power Co (investor owned) Electric retail service territory (HIFLD, US government). |
| Balancing authority | SOCO |
| Nearest gas pipeline | Transcontinental Gas PL, interstate pipeline, 4.8 km away US Energy Information Administration pipeline map. Straight-line distance. |
| Power plants within 50 km | 4.3 GW in 13 plants
Plants with a stated output in OpenStreetMap. The largest four are listed. |
| Grid carbon intensity | 352 g CO₂ per kWh (Georgia, 2025) Average of all power made in the area. Ember. |
| Grid power mix | gas 38.7%, nuclear 34.8%, coal 13.6%, solar 8.1%, bioenergy 3.2%. Clean power: 47.6% |
| Industrial power price | USD 0.131 per kWh (Georgia, August 2026) Average price paid by industrial users in the state. EIA Electric Power Monthly. |
Climate and water
| Average temperature | 16.3 °C NASA POWER, average of 2001 to 2025. |
|---|---|
| Highest temperature | 43.4 °C (2001 to 2025) |
| Cooling degree days | 1,053 per year (base 18.3 °C) More cooling degree days means more energy for cooling. |
| Solar energy | 4.5 kWh per m² per day |
| Wind at 50 m | 4.1 m/s average |
| Water stress today | Medium - High (20-40%) (Georgia) Share of the local water supply that people already use. WRI Aqueduct 4.0, province level. |
| Water stress in 2050 | Medium - High (20-40%) Business-as-usual scenario. |
Satellite view
Google satellite · Copernicus Sentinel-2 history · OpenStreetMap
Questions
How much power does QTS Atlanta-Suwanee (SUW1) use?
We estimate the facility power at about 67 MW. Estimate from building footprint, low confidence.
How close is QTS Atlanta-Suwanee (SUW1) to the power grid?
The nearest high-voltage substation in OpenStreetMap is Avonlea Substation (230 kV), about 1.2 km away. The local utility is Georgia Power Co, in the SOCO balancing area.
How clean is the power for QTS Atlanta-Suwanee (SUW1)?
The grid in Georgia emits about 352 g CO₂ per kWh (2025). Largest sources: gas 38.7%, nuclear 34.8%, coal 13.6%.
Who operates QTS Atlanta-Suwanee (SUW1)?
QTS Realty Trust.
Data centers near Suwanee
- QTS Suwanee 173 m · 34 MW
- Serverfarm ATL1 Atlanta 268 m
- Flexential - Atlanta/Norcross (ATL1/2) 15.5 km · 4.9 MW
- UPS Data Center 16.1 km · 20 MW
- Strategic Datasphere 17.4 km · 41 MW
- Mapletree Industrial 17.6 km · 22 MW
- Flexential - Atlanta/Alpharetta (ATL3/4) 18.5 km · 9.7 MW
- Secure Data Center 18.7 km · 34 MW
More QTS Realty Trust data centers
- QTS Atlanta-Metro (ATL1) United States
- QTS Irving - Dallas (DFW1) United States
- QTS Chicago (CHI1) United States
- QTS Atlanta-Fayetteville (ATL2) United States
- QTS Eemshaven (EEM1) Netherlands
- QTS Sacramento (SAC1) United States
- QTS Ashburn (ASH1) United States
- QTS Santa Clara (SJC1/SJC2) United States
Sources
Correct this page or get the data
Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.