Data Center Directory

UPS Data Center

UPS Data Center is an operational data center in Alpharetta, United States. Our footprint estimate of its power is about 20 MW.

Key facts

StatusOperational
Facility power20 MW (range 10 MW to 33 MW)
Estimate from building footprint, low confidence. Footprint estimate: about 17,017 m² building outline x 1 floor(s) x 1.2 kW/m².
GPU capacity if all AIabout 8,500 GPUs
If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count.
AddressMcFarland Parkway 1865, 30005, Alpharetta
Coordinates34.10338, -84.21497

Power and grid

UtilitySawnee Electric Membership Corporation (cooperative)
Electric retail service territory (HIFLD, US government).
Balancing authoritySOCO
Nearest gas pipelineTranscontinental Gas PL, interstate pipeline, 16.2 km away
US Energy Information Administration pipeline map. Straight-line distance.
Grid carbon intensity352 g CO₂ per kWh (Georgia, 2025)
Average of all power made in the area. Ember.
Grid power mixgas 38.7%, nuclear 34.8%, coal 13.6%, solar 8.1%, bioenergy 3.2%. Clean power: 47.6%
Industrial power priceUSD 0.131 per kWh (Georgia, August 2026)
Average price paid by industrial users in the state. EIA Electric Power Monthly.

Climate and water

Average temperature16.3 °C
NASA POWER, average of 2001 to 2025.
Highest temperature43.4 °C (2001 to 2025)
Cooling degree days1,053 per year (base 18.3 °C)
More cooling degree days means more energy for cooling.
Solar energy4.5 kWh per m² per day
Wind at 50 m4.1 m/s average
Water stress todayMedium - High (20-40%) (Georgia)
Share of the local water supply that people already use. WRI Aqueduct 4.0, province level.
Water stress in 2050Medium - High (20-40%)
Business-as-usual scenario.

Satellite view

Questions

How much power does UPS Data Center use?

We estimate the facility power at about 20 MW. Estimate from building footprint, low confidence.

How clean is the power for UPS Data Center?

The grid in Georgia emits about 352 g CO₂ per kWh (2025). Largest sources: gas 38.7%, nuclear 34.8%, coal 13.6%.

Data centers near Alpharetta

Sources

Correct this page or get the data

Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.