Secure Data Center
Secure Data Center is an operational data center in Alpharetta, United States. Our footprint estimate of its power is about 34 MW.
Key facts
| Status | Operational |
|---|---|
| Facility power | 34 MW (range 17 MW to 55 MW) Estimate from building footprint, low confidence. Footprint estimate: about 28,419 m² building outline x 1 floor(s) x 1.2 kW/m². |
| GPU capacity if all AI | about 15,000 GPUs If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count. |
| Coordinates | 34.09371, -84.25087 |
Power and grid
| Utility | Georgia Power Co (investor owned) Electric retail service territory (HIFLD, US government). |
|---|---|
| Balancing authority | SOCO |
| Nearest gas pipeline | Transcontinental Gas PL, interstate pipeline, 19.3 km away US Energy Information Administration pipeline map. Straight-line distance. |
| Grid carbon intensity | 352 g CO₂ per kWh (Georgia, 2025) Average of all power made in the area. Ember. |
| Grid power mix | gas 38.7%, nuclear 34.8%, coal 13.6%, solar 8.1%, bioenergy 3.2%. Clean power: 47.6% |
| Industrial power price | USD 0.131 per kWh (Georgia, August 2026) Average price paid by industrial users in the state. EIA Electric Power Monthly. |
Climate and water
| Average temperature | 16.1 °C NASA POWER, average of 2001 to 2025. |
|---|---|
| Highest temperature | 42.1 °C (2001 to 2025) |
| Cooling degree days | 1,020 per year (base 18.3 °C) More cooling degree days means more energy for cooling. |
| Solar energy | 4.43 kWh per m² per day |
| Wind at 50 m | 4.5 m/s average |
| Water stress today | Medium - High (20-40%) (Georgia) Share of the local water supply that people already use. WRI Aqueduct 4.0, province level. |
| Water stress in 2050 | Medium - High (20-40%) Business-as-usual scenario. |
Satellite view
Google satellite · Copernicus Sentinel-2 history · OpenStreetMap
Questions
How much power does Secure Data Center use?
We estimate the facility power at about 34 MW. Estimate from building footprint, low confidence.
How clean is the power for Secure Data Center?
The grid in Georgia emits about 352 g CO₂ per kWh (2025). Largest sources: gas 38.7%, nuclear 34.8%, coal 13.6%.
Data centers near Alpharetta
- Flexential - Atlanta/Alpharetta (ATL3/4) 741 m · 9.7 MW
- Mapletree Industrial 1.3 km · 22 MW
- Strategic Datasphere 1.4 km · 41 MW
- Hewlett-Packard 2.0 km · 18 MW
- T5 Data Center 2.3 km · 12 MW
- UPS Data Center 3.5 km · 20 MW
- 365 Data Centers Alpharetta (GA1) 3.9 km
- Data center in Alpharetta 4.2 km · 2.8 MW