Data center in Alpharetta

Data center in Alpharetta is an operational data center in Alpharetta, United States. Our footprint estimate of its power is about 2.8 MW.

Key facts

StatusOperational
Facility power2.8 MW (range 1.1 MW to 6.9 MW)
Estimate from building footprint, low confidence. Footprint estimate: about 23,031 m² site outline x 0.12 kW per m² of land.
GPU capacity if all AIabout 1,200 GPUs
If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count.
Coordinates34.06100, -84.27403

Power and grid

Nearest high-voltage substationUnnamed substation, 230 kV, 400 m away (Georgia Power)
Straight-line distance. OpenStreetMap, substations of 100 kV and more.
HV substations within 10 km15
UtilityGeorgia Power Co (investor owned)
Electric retail service territory (HIFLD, US government).
Balancing authoritySOCO
Nearest gas pipelineTranscontinental Gas PL, interstate pipeline, 21.6 km away
US Energy Information Administration pipeline map. Straight-line distance.
Power plants within 50 km3.1 GW in 9 plants
Plants with a stated output in OpenStreetMap. The largest four are listed.
Grid carbon intensity352 g CO₂ per kWh (Georgia, 2025)
Average of all power made in the area. Ember.
Grid power mixgas 38.7%, nuclear 34.8%, coal 13.6%, solar 8.1%, bioenergy 3.2%. Clean power: 47.6%
Industrial power priceUSD 0.131 per kWh (Georgia, August 2026)
Average price paid by industrial users in the state. EIA Electric Power Monthly.

Climate and water

Average temperature16.1 °C
NASA POWER, average of 2001 to 2025.
Highest temperature42.1 °C (2001 to 2025)
Cooling degree days1,020 per year (base 18.3 °C)
More cooling degree days means more energy for cooling.
Solar energy4.43 kWh per m² per day
Wind at 50 m4.5 m/s average
Water stress todayMedium - High (20-40%) (Georgia)
Share of the local water supply that people already use. WRI Aqueduct 4.0, province level.
Water stress in 2050Medium - High (20-40%)
Business-as-usual scenario.

Satellite view

Questions

How much power does Data center in Alpharetta use?

We estimate the facility power at about 2.8 MW. Estimate from building footprint, low confidence.

How close is Data center in Alpharetta to the power grid?

The nearest high-voltage substation in OpenStreetMap is an unnamed substation (230 kV), about 400 m away. The local utility is Georgia Power Co, in the SOCO balancing area.

How clean is the power for Data center in Alpharetta?

The grid in Georgia emits about 352 g CO₂ per kWh (2025). Largest sources: gas 38.7%, nuclear 34.8%, coal 13.6%.